When identifying a location to mount the Cellular Gateway, 

the device must be placed away from large metal objects and 

structures that can block cellular signal. Additionally, the cellu-

lar antenna is located on the upper right inner side wall of the 

enclosure. When mounting, ensure that this part of the device is 

away from any walls, wires, pipes, or other obstructions,  

especially anything metallic.
1.  Before mounting, apply power to the Cellular Gateway to 

ensure there is adequate cell coverage. On startup, the CELL 

LED will blink at a rate of 1sec. This indicates it is searching 

for a cell connection. Once connected it turns steady blue. 

If connection is poor, it will blink with short OFF pulse every 

second. If there is a poor or no connection, find a new  

location. 

Once cell coverage is established, disconnect 

power from the Cellular Gateway before proceeding.

2.  Mount the Cellular Gateway at the selected location, using the 

mounting tabs and screws provided with the kit. Screws to 

attach the unit to the wall are not included.

3.  Using the four-conductor cable supplied with the kit, connect 

the Control Box to the Cellular Gateway. Route wires from  

the WIRELESS terminals of the Control Box through the 

Cellular Gateway’s wiring gland and connect to the matching 

terminals.

  PWR to PWR
  GND to GND
  Input 1: Blue/Orange Wire
  Input 2: White/Green Wire
   Six feet of cable is supplied with the unit, but the Cellular 

Gateway can be located up to 100 feet away from the 

Control Box. If additional wire is used it must meet the 

required rating for the Control Box (300V, 22 AWG).

4.  To prevent water or dust from entering the Cellular Gateway, 

Control Box & Relay Box, tighten all wiring glands.

5. Apply power to the Control Box and Cellular Gateway.

 

1.  

Startup

 – Upon startup, the POWER LED will light up a 

steady green to indicate power is supplied. The Cellular 

Gateway will automatically go into its startup sequence. 

During the startup sequence, the CELL and IoT LED will blink 

blue, indicating the Cellular Gateway is searching for a cellular 

connection. This may take up to 10 minutes. Once the cellu-

lar and cloud connections are established, the CELL LED and 

IoT LED will be steady blue.

2.  

Cellular Connection

 – After the startup sequence is  

completed, the CELL LED will be a steady blue if there is a 

good connection. It will blink with short OFF pulses if there is 

a poor connection. 

3. 

 IoT  Connection

 – If there is a cloud connection, the IoT LED 

will be a steady blue. IoT LED will blink if cloud connection  

is lost or not established. It will continue trying to connect 

indefinitely.

4.  

Test Button

 – When cellular and Cloud connections have 

been made, you can send a test message through the 

Syncta app by pressing the TEST button.

5.  

Reset Button

 – You can reset the Cellular Gateway and 

restart the startup sequence by pressing the RESET button. 

This will cause all on-going operations to cease.

Installation and Set-Up

Installing the Cellular Gateway

Setting Up the Cellular Gateway

WARNING

!

Ensure all power supply to the Cellular Gateway is turned off before 

making any connections to the Cellular Gateway. Failure to do so may 

result in electrocution, personal injury, and/or death.

Cellular Gateway

Cellular 

Connection to 

Internet

Wired to Control Box

NOTICE

If there is no cloud connection, users will not receive notifi-

cations via Syncta.

Содержание AA-MFP-ACV

Страница 1: ...lications Typical 3 4 Control Box and Cellular Gateway Installation 5 Component Installation Details 6 Supplied Snubber Installation for the Pressure Sensor 6 Watertight Splice for the Pressure Transducer 7 Common Application Wiring Diagrams 8 10 Installation and Set Up 11 12 Installing the Cellular Gateway 11 Setting Up the Cellular Gateway 11 Startup Sequence 12 Operation 12 LEDs 13 Buttons 14 T...

Страница 2: ...n property damage or damage to the equipment This pictorial alerts you to the need to read the manual This pictorial alerts you to electricity electrocution and shock hazards Learn how to properly and safely use the equipment BEFORE installing setting up using or servicing Keep the guide available for easy access and future reference Replace missing damaged or illegible guides and product labels R...

Страница 3: ...3 ServiceGuide ACV Assure 2133 EDP 1917123 2021 Watts Applications Typical Solenoid Control Pressure Reducing ACV ACV Assure hardware installation on a 165 ft water tower base 165 ft Water Storage Tower ...

Страница 4: ...sure 2133 EDP 1917123 2021 Watts Applications Typical Pressure transducer installed in ground storage tank Remote installation with solar panel for power Vault with solar panel Inside vault Battery box with Cellular Gateway ...

Страница 5: ...the packaging foam to secure the Controller on both sides against the Control Box not shown Use the mounting feet which are included in the shipping box Mount in a good Cellular signal area Mount to a rigid structure The Cellular Gateway should be installed vertical and upright as shown at the field installation The Cellular Gateway should be mounted above the Control Box The Cellular Gateway shou...

Страница 6: ...he Flow Switch Connector Cable Pressure Sensor Teflon Tape Snubber Teflon Tape Component Installation Details Cellular Gateway Wiring Flow Switch Wiring Pressure Sensor installation must include the supplied snubber 1 Mount the snubber at the 1 4 NPT sensing location port 2 Wrap Teflon tape on the pressure transducer pipe threads 3 Install the pressure sensor into the snubber using a wrench on the...

Страница 7: ...ressure Transducer When Control Cable Length Exceeds 9ft Crimp butt connector PVC red 22 18ga Tubing length is 1 to 1 from dimension X X 3 8 ID adhesive lined heat shrink tubing 3 to 1 ratio Place tubing over cable first before crimping Use butane torch or heat gun to shrink tubing ...

Страница 8: ...troller 24VDC Power Supply 120 VAC 2 Conductor 18 20 AWG To Pressure Sensor 2 Conductor 18 20 AWG Control Cable 6 conductors 22 AWG PVC conductor insulation material for the Cellular Gateway Flow Switch Pressure Controller 24VDC Power Supply Limit Switch 2 Conductor 20 22 AWG 120 VAC 2 Conductor 18 20 AWG To Flow Switch 4 Conductor 22 AWG Relay Box Wiring for Pressure Sensing Relay Box for Monitor...

Страница 9: ...PVC conductor insulation material for the Cellular Gateway Flow Switch Pressure Controller 24VDC Power Supply To Solenoid 2 Conductor 18 20 AWG 120 VAC 2 Conductor 18 20 AWG To Pressure Sensor 2 Conductor 18 20 AWG Relay Box Wiring for Water Loss Sensing Common Application Wiring Diagrams ...

Страница 10: ... Solenoid 2 Conductor 18 20 AWG 120 VAC 2 Conductor 18 20 AWG To Pressure Sensor 2 Conductor 18 20 AWG Relay Box Wiring for ACV Zone Control Control Cable 6 conductors 22 AWG PVC conductor insulation material for the Cellular Gateway Flow Switch Pressure Controller 24VDC Power Supply Limit Switch 2 Conductor 20 22 AWG Common Application Wiring Diagrams Relay Box Wiring for ACV Open or Close Positi...

Страница 11: ...ting for the Control Box 300V 22 AWG 4 To prevent water or dust from entering the Cellular Gateway Control Box Relay Box tighten all wiring glands 5 Apply power to the Control Box and Cellular Gateway 1 Startup Upon startup the POWER LED will light up a steady green to indicate power is supplied The Cellular Gateway will automatically go into its startup sequence During the startup sequence the CE...

Страница 12: ...quence When the Cellular Gateway powers up the device goes through a startup sequence Below is the startup sequence that the device will go through if everything is working correctly Operation This section provides information about the different LED lights buttons and connectors inside the SentryPlus Alert Cellular Gateway as well as troubleshooting suggestions if needed Cellular Gateway Cellular...

Страница 13: ...ion to the cloud COLOR STATE DEFINITION SOLUTION Steady Blue There is a connection to the Watts Cloud N A Blinking There is not a connection to the Watts Cloud Trying to establish connection See No Connection to the cloud on page 12 Power The POWER LED turns on when power is supplied to the device COLOR STATE DEFINITION SOLUTION Steady Green The device is turned on N A Off If the device is plugged...

Страница 14: ...eway and restart the device This will cause all ongoing operations to cease Note You can also perform a full reset by removing power to the Cellular Gateway for 10 seconds and then plugging it back in TEST Press to have a test notification sent Note The unit must have already been registered and commu nication preferences must be set in order for these notifications to be sent Cellular Gateway Cel...

Страница 15: ...or other obstructions such as an electrical box Possible Cause 2 The location has poor cellular reception Solution 2 Move your Cellular Gateway to a different location and check to see that the CELLULAR LED is steady blue if it is not move the device until you find a location with better cellular reception Note You can install the Cellular Gateway up to 100 feet away from the Junction Box Six feet...

Страница 16: ...ause If the Cellular Gateway is plugged in and the POWER LED is off the 24Vdc GND wiring polarity inside the Cellular Gateway might have been accidentally swapped Solution Use the instructions below to swap the 24Vdc and GND wiring inside the Cellular Gateway 1 Remove power from the Control Box 2 Swap places of the wires in the power terminals of the Cellular Gateway 3 Reapply power to the Control...

Страница 17: ...r commissioning latch the Control Box cover closed and use the supplied tamper resistant screw and nut M4 x 16mm to secure the Control Box closed Assemble the cover and use 2 supplied tamper resistant M4 x 16mm screws After wiring remove 2 diagonal captured M4 x 16mm screws Installing Covers on Cellular Gateway and Control Box ...

Страница 18: ...Assets Register the Syncta device https app syncta com en connected onboarding welcome Log in to the Syncta account https app syncta com users sign_in already logged into your account go to https app syncta com en connected dashboard Step 1 Step 5 Step 2 Step 6 Step 3 Step 7 Step 4 Step 8 ...

Страница 19: ... _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Страница 20: ... product does not work properly other costs resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no control This warranty shall be invalidated by any abuse misuse misapplication improper installation or improper maintenance or alteration of the product Some Sta...

Отзывы: