13.3.5 Control cable installation
Procedure
1. Remove four M3x10 Pozidriv screws from relay module cover in order
shown.
2. Remove cover from drive.
If cover adheres to drive housing, gently tap to free it.
Do not
prise off
with tools.
3. Ensure gasket is retained within recessed channel on drive housing.
4. Unscrew sealing plugs from relay module cover using 21 mm spanner.
5. Fit new sealing washer onto supplied ½ ” NPT cable gland.
6. Screw supplied ½ ” NPT cable gland with new sealing washers into relay
module cover.
7. Ensure cable gland retaining nut is properly seated.
8. Use 21 mm spanner to tighten gland to 2.5 Nm to ensure ingress rating.
If different gland used, it must be IP66 rated.
13 INSTALLATION: PART 4 (CONTROL CONNECTIONS AND WIRING)
96
Содержание qdos 20
Страница 40: ...6 Storage 6 1 Storage conditions 41 6 2 Shelf life 41 6 STORAGE 40...
Страница 169: ...Procedure 9 NEXT 10 Use keys to set Alert Level Procedure 11 SELECT to return to FLUID LEVEL SETTINGS 16 OPERATION 169...
Страница 192: ...NOTICE The pumphead locking lever is designed to be loosened or tightened by hand 17 MAINTENANCE 192...