16.1 Pre-operation check list
Ensure the pump has been installed correctly: Carry out the following pre-operation checks:
l
Ensure the pump has been mounted to a surface.
l
Ensure the power cable is not damaged.
l
Ensure electrical isolation device if fitted and working.
l
Ensure the pumphead has been installed.
l
Ensure no leaks of fluid from any connection with the pump stationary.
l
Ensure a fluid isolation valve on
inlet
and
discharge
is fitted and working.
l
Ensure overpressure protection is fitted and working correctly.
l
Ensure the pump language has been correctly set to your language.
If there is a problem with any of the above or there is any doubt that the installation of the pump has not been
completed and tested, then do not proceed to operate the pump. Instruct that the pump is removed from service
until the full installation is complete.
16 OPERATION
161
Содержание qdos 20
Страница 40: ...6 Storage 6 1 Storage conditions 41 6 2 Shelf life 41 6 STORAGE 40...
Страница 169: ...Procedure 9 NEXT 10 Use keys to set Alert Level Procedure 11 SELECT to return to FLUID LEVEL SETTINGS 16 OPERATION 169...
Страница 192: ...NOTICE The pumphead locking lever is designed to be loosened or tightened by hand 17 MAINTENANCE 192...