COMMISSIONING
33
6.2
Commissioning
1.
Connect the pipework.
2.
Make sure that there are no obstructions such
as closed valves.
3.
Switch on the hose pump.
4.
Check the rotation direction of the pump rotor.
5.
Check the capacity of the hose pump. If the
capacity differs from your specification, follow
the instructions in chapter
11
or consult your
Bredel representative.
6.
Check the hose pump in accordance with points
1 to 4 of the maintenance table from §
8.2
.
Содержание Bredel 265
Страница 2: ...2...
Страница 95: ...NOTES 95 Notes NOTES...