SECTION 1: MOUNTING THE STEAM GENERATOR (continued) 

 

1. WALL MOUNTING:  

a) 

Remove the side cover. Note the location of the mounting holes on 
the back of the generator. The screws must set directly into studs 
or equivalent supports. Drill pilot holes on 14-1/2

” (368 mm) centers 

and install the two #10 1½" screws, provided.  

See at right

 

b) 

Carefully hang the generator on the two screws. Tighten the 
screws.  
 

c) 

The generator may be further secured with two screws mounted on 
the same 14-1/2

” (368 mm) centers as shown. 

 

d) 

Replace the front cover with its four screws. 

 
2. FLOOR MOUNTING: 

 

a) 

In general, the width of the unit allows it to sit on a shelf, across the 
ceiling joists or on a floor. The generator must be restrained from 
moving. Normally, the piping will provide adequate support. If not, 
additional support must be provided. 

 

b) 

All floor installed generators must provide for routine draining of the 
tank and for draining the safety v

alve’s outlet. 

 

SECTION 2: WATER QUALITY REQUIREMENTS 

 
The nature of a boiler or steam bath generator requires testing of the 
feedwater to avoid potential high concentrations of impurities which can 
cause a deposit or scale to form on the internal surfaces. This deposit 
or scale can interfere with the equipment's proper operation and even 
cause premature boiler or generator failure. Concentration of impurities is generally controlled by treating the 
feedwater and or "blowing down" the generator or boiler when it is not heating. The "blow down" process involves 
removing a portion of the tank water with high solid concentration and replacing it with makeup water. 
 
This is particularly important in areas with high calcium levels and other water quality problems. Calcium build-up 
can cause poor steamer performance and damage the heating elements! 
 

Be especially careful to prevent foaming in the steamer’s water! Foaming water will affect the water level 
measuring systems in steamers and boilers, causing operation problems and possibly leading to early element 
failures! 

 
To ensure proper operation, the water supply should be tested prior to operating the equipment. There are several 
treatment processes which can be used if you have a problem with hard water. A local reliable water treatment 
company can recommend the appropriate treatment if required. The recommended feedwater quality is listed on 
the next page. 
 

Recommended Feedwater Quality 

 

Hardness 

 

 

   10 

–   30 ppm - (0.5   - 1.75 gpg) 

T-Alkalinity 

 

 

 150 

– 700 ppm - (8.75 - 40.8 gpg) 

Silica Range 

 

 

   15 

–   25 ppm - (1.28 - 1.45 gpg) 

PH (strength of alkalinity) 

10.5 -- 11.5 

 

WALL MOUNTING 

 

        

 

14.5” [368 mm] 

14.5” [368 mm] 

Содержание WWSU08

Страница 1: ...teamer should be the primary unit Each steamer should have its own automatic drain For commercial use we recommend checking with your local inspectors to confirm the steamer system is acceptable for y...

Страница 2: ...age Important Safety Instruction 3 6 1 Mounting the Generator 7 8 2 Water Quality Requirements 8 3 Plumbing Instructions 9 12 4 Wiring Instructions 12 Electrical Information Chart 13 5 Bath Control In...

Страница 3: ...ng must be installed by a licensed plumber in accordance with all applicable local and national codes Install indoors only Protect from freezing Generator must be level side to side and end to end The...

Страница 4: ...erie doit tre install par un plombier sous licence conform ment tous les codes locaux et nationaux applicables Installer l int rieur uniquement Prot ger du gel G n rateur doit tre mise niveau lat rale...

Страница 5: ...ERVICE INSTRUCTIONS 4211 1661 Rev A 01 28 2022 Page 5 of 17 POST WARNING LABEL OUTSIDE STEAMBATH FOR SAFETY WARNINGS tiquette d avertissement Ext rieur poste baiin de vapeur pour les avertissements re...

Страница 6: ...utilis par toute personne y compris les enfants avec toutes leurs capacit s physiques sensorielles ou mentales ou qui manquent d exp rience ou de connaissances moins qu ils aient la supervision ou de...

Страница 7: ...ervice Provide clearance for plumbing and electrical service and for element removal See Diagram 1 6 The steam line should slope to allow condensation to drain The mounting location should minimize th...

Страница 8: ...ale to form on the internal surfaces This deposit or scale can interfere with the equipment s proper operation and even cause premature boiler or generator failure Concentration of impurities is gener...

Страница 9: ...ator to allow for future servicing if needed and for emergency shut off Make sure the shut off is open providing water to the generator before turning it on IMPORTANT Water pressure required 20 100 ps...

Страница 10: ...5 mm hole for the steam line entry Center the 1 2 copper steam pipe in the hole See Diagram 4 Terminate the steam line with a 1 2 NPT male adapter Stub the line out into the room 3 8 9 5 mm from the f...

Страница 11: ...t have a drain valve installed to allow draining the tank for cleaning and maintenance A manual ball valve is supplied An electronic ball valve is available in the ADK Autodrain option When installed...

Страница 12: ...dicated on the wire diagram for your voltage and phase This may require moving factory installed jumper Do not change the steamer s internal jumpers or wiring Only the supply wiring side of the termin...

Страница 13: ...240 208 230 240 WWSU08 208 36 50 240 30 31 40 40 WWSU11 208 18 36 30 50 240 44 46 60 60 WWSU15 208 24 42 30 60 240 20 36 21 38 30 50 30 50 Nominal Amps at operating VAC 3 phz Recommended Breaker Mode...

Страница 14: ...room The K3 and KT3 controls have a short tube on the back to help locate the control and to protect the cable end All of these controls connect to the steam generator s circuit board through Waterwor...

Страница 15: ...or leaks 2 After the tank has filled to a safe level the heating elements will turn on Allow about 10 minutes for the steam to appear in the steam room 3 Once the steam is visible use the control to t...

Страница 16: ...INSTALLATION AND SERVICE INSTRUCTIONS 4211 1661 Rev A 01 28 2022 Page 16 of 17...

Страница 17: ...INSTALLATION AND SERVICE INSTRUCTIONS 4211 1661 Rev A 01 28 2022 Page 17 of 17 240V MODELS 208V MODELS...

Страница 18: ...drain For commercial use we recommend checking with your local inspectors to confirm the steamer system is acceptable for your use Many jurisdictions will require an ASME boiler for commercial use WA...

Страница 19: ...ION continued IMPORTANT Before deciding on a mounting location please read through these installation instructions completely and take a careful look at al of the diagrams An exhaust fan installed out...

Страница 20: ...YPICAL DRAIN LINES DIAGRAM 5 TYPICAL STEAM LINES IMPORTANT Input water pressure must be 20 100 psi 138 689 kPa If the generators are mounted in a place difficult for the home owner to access the water...

Страница 21: ...instructions document 4211 1661 for details regarding plumbing of the individual steamers in your system INSTALL THE PRESSURE RELIEF VALVE Each steamer must have its own pressure safety valve 10psi 69...

Страница 22: ...Refer to the wiring diagrams to determine your connection points and the necessary jumper connection Connections can be varied to use either single phase or 3 phase or 3 phase Neutral Connect the eart...

Страница 23: ...s the ON OFF switch 6 Within one minute the units should again produce steam The generators should call for water once every two minutes or more depending on their power rating It s normal for the flo...

Страница 24: ...TERIORCONTROLISMOUNTEDOUTSIDETHEENCLOSURETO ALLOW FOR EASY ADJUSTMENTS TO THE TIME AND TEMPERATURE STEAMBATH SCHEDULE THE INTERIOR CONTROLIS MOUNTED INSIDE THE ENCLOSURE TO ALLOW TEMPERATURE SENSING A...

Страница 25: ...Description Page Important Safety Instructions 3 1A Exterior Control Overview 4 1B Interior Control Overview 4 2 Operation of Your WWSUP18 and WWSUP19 Controls 4 3 How toTake a Steambath 4 4 Maintena...

Страница 26: ...hould consult a physician regarding correct exposure e Obese persons and persons with a history of heart disease low or high blood pressure circulatory system problems or diabetes should consult a phy...

Страница 27: ...The control will alternately display time remaining and the actual temperature at the sensor in your steam room every 5 seconds 4 To change the time setting press and hold the TIME button on the cont...

Страница 28: ...emperature adjustment needs setting 1 See Section 3 Temperature Adjustment 2 Call WATERWORKS Service Department Control ON exterior or interior Control displays E001 Temperature sensor not connected 1...

Страница 29: ...4209 55 REV A 01 28 2022 WWSU46 OWNERS MANUAL page 6...

Отзывы: