background image

 

 
 

HIGHGATE 

  

Pressure Balance with Diverter Trim

 

INSTALLATION GUIDELINES 

Page 2 of 3 

 

 

6.6.2012 

These guidelines have been prepared for the professional contractor to aid in the installation of: 
HIGHGATE PRESSURE BALANCE TRIM WITH PORCELAIN LEVER HANDLE WITH DIVERTER 
(STYLE# HGPB30) 
All dimensions are based on original specification and are subject to change and variation. 
Please consult your Design Associate for current specifications. 

 

 

HOT LIMIT SAFETY STOP CALIBRATION: 

¾

 

IMPORTANT: The Pressure Balance Valve is 
equipped with a hot limit safety stop screw to limit 
the valve handle from being turned to excessive hot 
water discharge temperatures.  

4.

 

Remove the dome cover and open the valve to the 
maximum desired temperature verified with a 
thermometer and turn the safety stop screw 
clockwise until it seats. See Figure - 02. WARNING: 
Failure to adjust the hot limit safety stop screw 
properly may result in serious scalding.  

Figure - 02

 

Dome Cover    

Safety Stop Screw     

 Packing Nut

 

 TRIM INSTALLATION: 

5.

 

Screw the nose cone (7) onto the packing nut until 
fully seated.   

6.

 

Slide the trim plate (11) over the nose cone (7). Make 
sure the diverter lever (10) is properly aligned with 
the diverter spindle in the valve. See Figure-03. If it 
is difficult to slide the plate over the nose cone, 
moisten the o-ring (9) inside the plate.  

Figure - 03 

 Diverter Spindle 

 Diverter Lever

 

 
7.

 

Attach the trim plate to the valve with the screws 
(8) provided 

8.

 

Remove indice (1) from the handle (5) to remove the 
screw (3) and washer (4). 

9.

 

Slide the nose cone cap over the valve stem then 
attach the handle to the stem using the screw (3) 

and washer (4).  

10.

 

Re-insert the indice (1) with the o-ring (2) into the 
handle.  

¾

 

If further assistance is required, please contact 
Product Support at 1-800-927-2120 (9am-6pm EST). 

  

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание HIGHGATE GUPB87R

Страница 1: ...erly Be sure your installation conforms to federal state and local codes In the State of Massachusetts all installations must comply with the rules and regulations set forth within 248 CMR This produc...

Страница 2: ...screw clockwise until it seats See Figure 02 WARNING Failure to adjust the hot limit safety stop screw properly may result in serious scalding Figure 02 Dome Cover Safety Stop Screw Packing Nut TRIM...

Страница 3: ...TH DIVERTER STYLE HGPB30 All dimensions are based on original specification and are subject to change and variation Please consult your Design Associate for current specifications 8 9 1 2 4 3 7 6 5 10...

Страница 4: ...STYLE HGPB10 Highgate Pressure Balance Control Valve Trim with White Porcelain Lever Handles service parts STYLE HGPB30 Highgate Pressure Balance with Diverter Trim with White Porcelain Lever Handles...

Страница 5: ...es troubleshooting and technical problem resolution including replacement parts and installation recommendations throughout the life of your product Product Support is available Monday through Friday...

Страница 6: ...0 EXT 2 FINISH COLOR MUST BE SPECIFIED WHEN ORDERING SUPPLIED AS A PAIR STYLES HGPB10 HGPB30 MAIN KITS 788757 VALVE FACEPLATE KIT 359274 TRIM SCREW KIT 412905 GLAND COVER KIT 944827 NOSE CONE KIT 1036...

Страница 7: ...NISH COLOR MUST BE SPECIFIED WHEN ORDERING SUPPLIED AS A PAIR STYLES HGPB10 HGPB30 KIT COMPONENTS 537281 VALVE FACEPLATE KIT O RING O RING CLIP DIVERTER LEVER GASKET TRIM PLATE 788757 VALVE FACEPLATE...

Страница 8: ...TS INDEX 6 PRODUCT SUPPORT 1 800 927 2120 EXT 2 STYLES HGPB10 HGPB30 224846 HANDLE SCREW KIT 103601 HANDLE KIT KIT COMPONENTS HANDLE 412905 103601 224846 103602 944827 359274 537281 788757 GLAND COVER...

Страница 9: ...PRODUCT SUPPORT 60 BACKUS AVENUE DANBURY CT 06810 1 800 927 2120 EXT 2 WWW WATERWORKS COM STUDIO...

Отзывы: