![Waterworks EEBT01 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/waterworks/eebt01/eebt01_installation-manuallines_3684904004.webp)
PRODUCT SUPPORT | 800.927.2120 | WATERWORKS.COM
PAGE 4 OF 4 | UPDATED ON 4.29.2021
STYLE No.
EEBT01
Emile 67” x 27” x 27-1/2” Freestanding Oval
Cast Iron Bathtub
INSTALLATION GUIDELINES
13. Cut the TAILPIECE as needed then make final drain
connections and tighten the COMPRESSIONS
NUTS.
14. Plug the DRAIN and fill the BATHTUB until water
enters the overflow hole.
15. Drain the BATHTUB and inspect all connections for
leaks.
16. Slide the ESCUTCHEON down the OVERFLOW
PIPE until it contacts the floor then cover the
BATHTUB surface with a liner or other protective
material (not supplied) until construction is
complete.
[MAKE FINAL DRAIN
CONNECTIONS]
COMPRESSION
NUT [x3]
SPOUT *
[SOLD SEPARATELY]
* TURN ON WATER
PLUG
PLUG
[CHECK ALL CONNECTIONS
FOR LEAKS]
PROTECTIVE
MATERIAL
[NOT PROVIDED]
ESCUTCHEON