Waters ACQUITY UPLC I-Class Скачать руководство пользователя страница 63

Signal connections

B-7

3. Fit the grounding cable’s fork terminal on the rear panel grounding 

stud, and secure the terminal with the locking nut. 

Tip:

 Use the 9/32-inch nut driver to tighten the locking nut until the fork 

terminal does not move.

Binary solvent manager I/O signal connectors

The rear panel of the binary solvent manager includes two removable 

connectors that hold the screw terminals for I/O signal cables. These 

connectors are keyed so that they can be inserted only one way.

Fork terminal

Locking nut

Grounding stud

Содержание ACQUITY UPLC I-Class

Страница 1: ...ACQUITY UPLC I Class System Guide 715003736 Revision B Copyright Waters Corporation 2014 All rights reserved...

Страница 2: ...Waters Web site waters com Trademarks ACQUITY ACQUITY UPLC Connections INSIGHT Millennium PIC UPLC and Waters are registered trademarks and Auto Blend Plus eCord Empower LAC E MassLynx XBridge and THE...

Страница 3: ...reach us at tech_comm waters com Contacting Waters Contact Waters with enhancement requests or technical questions regarding the use transportation removal or disposal of any Waters product You can r...

Страница 4: ...Class instruments See also For safety considerations regarding specific system modules consult the appropriate information on the user documentation CD High voltage hazard Safety advisories Consult Ap...

Страница 5: ...applications Calibrating To calibrate LC systems follow acceptable calibration methods using at least five standards to generate a standard curve The concentration range for standards should include t...

Страница 6: ...ion from day to day and run to run Data collected when QC samples are out of range might not be valid Do not report these data until you are certain that the instrument performs satisfactorily ISM cla...

Страница 7: ...vii EC authorized representative Waters Corporation Stamford Avenue Altrincham Road Wilmslow SK9 4AX United Kingdom Telephone 44 161 946 2400 Fax 44 161 946 2480 Contact Quality manager...

Страница 8: ...viii...

Страница 9: ...ntended use of the ACQUITY UPLC I Class system v Calibrating v Quality control vi ISM classification vi ISM Classification ISM Group 1 Class B vi EC authorized representative vii 1 ACQUITY UPLC I Clas...

Страница 10: ...1 11 2 Optimizing Performance 2 1 General guidelines 2 2 Dispersion 2 3 Carryover 2 4 Contamination 2 5 Reproducibility 2 5 Cycle time between injections 2 5 Preventing leaks 2 5 Sample preparation 2...

Страница 11: ...2 Task specific hazard warnings A 2 Specific warnings A 3 Caution advisory A 5 Warnings that apply to all Waters instruments A 5 Electrical and handling symbols A 11 Electrical symbols A 11 Handling s...

Страница 12: ...xii Table of Contents...

Страница 13: ...for optimum performance when running difficult assays Configure it with a mass spectrometer to take full advantage of the system s design enhancements Contents Topic Page UltraPerformance Liquid Chro...

Страница 14: ...are as high as 18 000 psi The van Deemter equation an empirical formula that describes the relationship between linear velocity and column efficiency considers particle size as one of the variables Th...

Страница 15: ...matographic conditions for the separations were identical except for the flow rate which was scaled according to particle size Features of the ACQUITY UPLC I Class system The ACQUTY UPLC I Class syste...

Страница 16: ...maintaining the integrity of the separation Column compartments Column compartments configured with I Class systems ensure reliable and robust separations This is especially important when you transfe...

Страница 17: ...ometry applications Detectors The PDA and TUV detectors available with the I Class system feature low dispersion UV flow cell technology which enhances peak resolution Mass spectrometry When you confi...

Страница 18: ...ugh needle or fixed loop a column heater CH A detectors tunable ultraviolet photodiode array e photodiode array or mass spectrometry and an ACQUITY UPLC column Waters Empower chromatography data softw...

Страница 19: ...s Sample Manager FTN uses a flow through needle mechanism that differs from a loop based injector The mechanism aspirates a sample from plates and vials and holds it in the sample needle in preparatio...

Страница 20: ...ACQUITY UPLC I Class system s column heater helps to ensure precise reproducible separations by controlling the column temperature The column heater CH A heats the column compartment to any temperatu...

Страница 21: ...UPLC Systems with 2D Technology Capabilities Guide Sample organizer optional Requirement Verify that the sample organizer you use with your I Class system is compatible with sample managers fitted wi...

Страница 22: ...t pressure that the column has experienced and the date The highest temperature the column has experienced and the date In addition to the variable column usage data the eCord column chip also stores...

Страница 23: ...ou can find this additional information about the ACQUITY I Class system ACQUITY UPLC Binary Solvent Manager Operator s Overview and Maintenance Information ACQUITY UPLC Sample Manager Flow Through Ne...

Страница 24: ...1 12 ACQUITY UPLC I Class System...

Страница 25: ...chapter to help ensure optimum performance from your ACQUITY UPLC I Class system Contents Topic Page General guidelines 2 2 Dispersion 2 3 Carryover 2 4 Contamination 2 5 Reproducibility 2 5 Cycle ti...

Страница 26: ...less than 0 5 seconds wide Waters recommends a sampling rate of 25 to 50 points across a peak which provides good quantitation Sampling rates faster than 20 points per second yield higher baseline noi...

Страница 27: ...nt lines during system startup Keep all solvent lines primed Monitor the waste level to ensure that it is never too high When starting the binary solvent manager ensure solvent flows through pump A an...

Страница 28: ...analyte remains in the system after a sample is injected You can measure carryover by observing analyte peaks that appear when you run a blank sample immediately after an analytical sample See ACQUIT...

Страница 29: ...pecifications for details Cycle time between injections The short run time of a UPLC separation requires efficient use of the time between analyses The ACQUITY SM FTN and SM FL have Load Ahead and Loo...

Страница 30: ...nnecting active preheaters Sample preparation UPLC analysis places some additional restrictions on sample preparation Particulates The small column frit size 0 2 m can become blocked more easily than...

Страница 31: ...3 1 3 Preparing the System Contents Topic Page Preparing system hardware 3 2 Configuring chromatography data software 3 5 ACQUITY control panels 3 6 Starting the ACQUITY UPLC Console 3 13...

Страница 32: ...le manager by pressing the power switch on the top left hand side of each devices door See also Status LEDs on page 3 3 and Power LED on page 3 3 for information on how to interpret LED modes for devi...

Страница 33: ...de of the power LED on the binary solvent manager s front panel indicates the flow status A steady green flow LED indicates flow through the binary solvent manager Run LED sample manager The run LED o...

Страница 34: ...plete any outstanding samples or diagnostic function requests When sample and diagnostic function requests are finished the LED reverts to the unlit mode Detector Indicates the detector lamp is ignite...

Страница 35: ...nt when you intend to use fresh solvents of the same composition as those already in the system To refresh the system 1 In the ACQUITY UPLC Console click Control Start up system 2 In the Start up syst...

Страница 36: ...ol panel displays flow status system pressure total flow rate and solvent composition parameters Rule You can edit these parameters when the system is idle by clicking the underlined value You cannot...

Страница 37: ...top Flow Immediately stops all flow from the binary solvent manager Additional functions in the binary solvent manager control panel Control panel function Description Start up system Brings the syste...

Страница 38: ...ulating air whenever the sample compartment door is open Wash plungers Initiates the plunger wash sequence which fills and then slowly empties the primary and accumulator chambers with the current sol...

Страница 39: ...ed Sample Compartment Set Point Displays the current sample compartment set point to 0 1 C resolution When active temperature control is disabled this field displays Off Current Column Heater Temperat...

Страница 40: ...Photodiode Array Detector Getting Started Guide Control panel Additional functions in the sample manager control panel Control panel function Description Prime Displays the Prime dialog box See Primin...

Страница 41: ...dow TUV detector control panel items Control panel item Description Lamp On Off LED Displays the actual lamp on off LED on the front panel of the detector unless communications with the detector are l...

Страница 42: ...ctions by right clicking anywhere in the column manager control panel Column manager control panel items Control panel item Description Run LED Displays the actual run LED on the front panel of the co...

Страница 43: ...ations of each module and its components You can also navigate to interactive diagrams which show interconnections and provide diagnostic tools for troubleshooting problems To start the ACQUITY UPLC C...

Страница 44: ...3 14 Preparing the System...

Страница 45: ...es also include the hazard symbols with accompanying text statements describing the hazards and telling you how to avoid them This appendix presents all the safety symbols and statements that apply to...

Страница 46: ...electric shocks ultraviolet radiation exposures and others When the following symbols appear in a manual s narratives or procedures their accompanying text identifies the specific risk and explains ho...

Страница 47: ...tion Extinguish all nearby flames Do not use tubing that is or has been stressed or kinked Do not expose nonmetallic tubing to incompatible compounds like tetrahydrofuran THF and nitric or sulfuric ac...

Страница 48: ...al surfaces of the mass spectrometer when the instrument is in Operate mode To avoid nonlethal electric shock make sure the instrument is in Standby mode before touching areas marked with this high vo...

Страница 49: ...this device follow standard quality control procedures and the equipment guidelines in this section Warning Waters instruments can be used to analyze or process potentially hazardous substances To avo...

Страница 50: ...er Modifikationen an dem Ger t ohne die ausdr ckliche Genehmigung der f r die ordnungsgem e Funktionst chtigkeit verantwortlichen Personen kann zum Entzug der Bedienungsbefugnis des Systems f hren Avv...

Страница 51: ...e trouvant proximit de l instrument Evitez d utiliser des tubes s v rement d form s ou endommag s Evitez d utiliser des tubes non m talliques avec du t trahydrofurane THF ou de l acide sulfurique ou n...

Страница 52: ...iamenti nei tubi non metallici riducendo notevolmente la pressione di rottura dei tubi stessi Advertencia se recomienda precauci n cuando se trabaje con tubos de pol mero sometidos a presi n El usuari...

Страница 53: ...Warnings that apply to all Waters instruments A 9 Nonmetallic Tetrahydrofuran THF Methylene chloride Dimethyl sulfoxide THF...

Страница 54: ...tueuses Vorsicht Der Benutzer wird darauf aufmerksam gemacht dass bei unsachgem er Verwenddung des Ger tes die eingebauten Sicherheitseinrichtungen unter Umst nden nicht ordnungsgem funktionieren Atte...

Страница 55: ...ls These can appear in instrument user manuals and on the instrument s front or rear panels Electrical power on Electrical power off Standby Direct current Alternating current Protective conductor ter...

Страница 56: ...visories Handling symbols These handling symbols and their associated text can appear on labels affixed to the outer packaging of Waters instrument and component shipments Keep upright Keep dry Fragil...

Страница 57: ...m modules If you must transport a system component or remove it from service contact Waters Technical Service for recommended cleaning flushing and packaging procedures System tubing connections The s...

Страница 58: ...ample Manager FTN BSM solvents SM wash solvent Column Column heater or manager APH Needle Sample organizer Injection port To waste Injector valve Vent valve Mixer Waste Pump A Pump B Binary solvent ma...

Страница 59: ...r FL SM wash solvents Column Column heater or manager APH Needle Sample organizer Wash port To waste Sample syringe Injector valve Vent valve Mixer Waste Pump A Pump B Binary solvent manager Degasser...

Страница 60: ...ar panel connections for ACQUITY UPLC I Class system modules are shown below TP03423 Ethernet switch External power and communications cable CH A and CH 30A only Ethernet cables Power cords Ethernet c...

Страница 61: ...lumn heater and the sample manager To make column heater connections 1 Make sure the sample manager and the column heater are powered off 2 Connect the external communication cable to the High Density...

Страница 62: ...nector Signal cable To make signal connections 1 Insert the connector into the connector port on the back of the system module 2 Using the flat blade screwdriver attach the positive and negative leads...

Страница 63: ...h nut driver to tighten the locking nut until the fork terminal does not move Binary solvent manager I O signal connectors The rear panel of the binary solvent manager includes two removable connector...

Страница 64: ...nary solvent manager has ceased operation because of an error condition or operator request Switch 1 Out Used to send time based contact closure signals to external devices 1 2 3 4 5 6 7 8 9 10 11 12...

Страница 65: ...from the binary solvent manager when an error condition or hardware failure occurs on another system module Switch 2 Out Used to send time based contact closure signals to external devices Switch 3 Ou...

Страница 66: ...to trigger a mass spectrometer or an ACQUITY 2996 PDA detector running under MassLynx software control to start Sample manager I O signal connectors For electrical specifications see the ACQUITY UPLC...

Страница 67: ...em To connect to the electricity source Recommendation Use a line conditioner and uninterruptible power supply UPS for optimum long term input voltage stability Sample manager event out event in conne...

Страница 68: ...n the rear panel of each system module Connect the hooded male end of the FlexCart s electrical cables to the power strips on the back of the cart Finally connect each power strip s cable to a wall ou...

Отзывы: