background image

715001213, Rev. B

3 of 5

A. Remove the nebulizer and fill the U-tube with mobile phase.
B. Slide the nebulizer into place with the air coupler at 12 o’clock to align the pins 

and turn it 90 degrees clockwise.

C. Connect the column’s outlet using PEEK tubing (P/N 430001562) to the 

nebulizer’s inlet port. If connecting from a UV detector, use PEEK tubing P/N 

430001565.

D. Connect the gas input to the nebulizer’s gas inlet port.
E. Connect the drip tray tubing to the waste management system.

E

F

B

C

D

Push in, then 

turn right 90 

degrees.

Install tubing.

Nebulizer Connections

A

Figure 2 - Filling U-Tube

Figure 3 - Nebulizer Connections

Figure 4 - Plumbing and Leak Sensor Installed

Отзывы: