Safety
Introduction
Product Overview
Installation
Operation
Maintenance
Troubleshooting
Warranty
33 | 44
Priming the Foam Pump
1. Locate the inject/bypass valve on the foam pump (
1
2
1. Foam pump
2. Inject/discharge valve
Figure 18
2. Rotate the inject/bypass handle to the bypass position. Refer the
AQUIS™
Foam System
manual.
3. Prepare a container to collect the concentrate discharged from the hose.
4. Navigate the solution screen (
).
5. Press the foam button to enable the foam pump (
6. Press the prime button (
7. The pump is primed when the concentrate discharges from the hose.
8. Press the prime button to stop the foam pump (
9. Rotate the inject/bypass handle to the inject position and store the hose.
Preparing for Operation
1. Check the compressor oil level. Refer to:
Drain the pump after use
and before servicing.
Liquid ejected at high
pressure can cause
serious injury.
High Pressure
•
•
2. Relieve pressure in the lines. Refer to:
"Relieving Waterline Pressure"
and
"Relieving Airline Pressure" on page 37
.
3. Connect the hose to the discharge outlet (
Содержание ECLIPSE CAFSystem 2.0
Страница 2: ......