![WATERLOO SDFC-125 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/waterloo/sdfc-125/sdfc-125_operating-and-maintenance_3636569003.webp)
3
www.waterloo.co.uk
Tel: +44 (0) 1622 711500
Operating and maintenance instructions
SDFC Series for Plasterboard ceiling
Plenum Installation:
4-
&OLSWKHSODVWLFFDSEDFNRYHUWKHKHDGRIWKH¿[LQJ
screw (Figures 4
Figure 4: Fit plastic cap over screw
Figure 5: Insert collar in ductwork
Figure 6: Position duct above the proposed ceiling
face location
Duct mount
bar this end
20 to 25mm
Proposed ceiling face position
Duct Mount Installation
An alternative method of installing this range of
diffusers is the use of a steel duct mount collar.
7KLV DOORZV ULJLG GXFWZRUN WR EH FRQQHFWHG GLUHFWO\
WR WKH UHDU RI WKH GLIIXVHU 7KHVH GXFW PRXQWV DUH
supplied to order, and the installation instructions are
as follows:
1-
3ULRUWRWKHLQVWDOODWLRQRIWKHGXFWZRUN¿WWKHGXFW
mount collar into the vertical section of the ductwork,
E\¿UVWRULHQWDWLQJWKHFROODUVRWKDWLW¶VPRXQWLQJEDU
µ8¶FKDQQHOLVRSHQWRWKHEDVHRIWKHGXFWZRUN
2-
Slide the collar up inside the ductwork until the end
of the ductwork is level with the top of the swage line
(Figures 5
6HFXUHWKHFROODUWRWKHGXFWZRUNE\SRS
riveting or screwing them together (Figures 5a
3-
Install the ductwork in its desired position prior to
¿WWLQJ RI WKH FHLOLQJ E\ VXVSHQGLQJ LW IURP WKH ÀRRU
VODEZLWKGURSURGVVXSSOLHGE\RWKHUV
4-
5DLVHRUORZHUWKHGXFWZRUNDVUHTXLUHGWRJLYHD
dimension of 20 to 25mm from the bottom of the duct
mount collar to the proposed ceiling face (Figures 6
2QFH\RXDUHKDSS\ZLWKLW¶VORFDWLRQWKHQVHFXUHWKH
ductwork in position using the lock nuts on the drop
rods.
Figure 5a: Secure collar in place
Drill and secure
as required
Do not drill below this swageline or
damage to the diffuser could occur