background image

 

14 

 

Rail placement 

 

Place the joined rails on top of the sub frame in 4 x places, evenly spaced, and no closer than 10mm 
from any edge. Align the centre of the join with the mid-point of the middle Sub Frame rail and 
clamp BOTH SIDES with the joiner clamps. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Ensure ALL edges are square and evenly placed before tightening all clamps.  
 

 
 
 
Check and tighten ALL frame bolts and clamps before proceeding. 
 

 

Содержание MAXI ARRAY

Страница 1: ...Array Frame Installation MAXI ARRAY...

Страница 2: ...TALLATION 7 Footings 7 Set Footing 7 Fastened Footing 8 ARRAY BUILD 9 Tube Cap 9 Beam 10 Angle Adjusters 10 Rails 12 Sub Frame 12 Upper Frame 13 SOLAR PANELS 15 Placing the solar panels on the array 1...

Страница 3: ...frame for your solar modules with an assembly method that is fast simple and secure Utilising a strong galvanised steel base with a lightweight aluminium support frame we can offer strength and flexib...

Страница 4: ...LIST PRODUCT NAME PICTURE COMMENTS 6x Aluminium Rail 1650mm Lengths 8x Aluminium Rail 2100mm Lengths 8x End Clamp Includes M8 Hexagon screw and fixing nut 12x Mid Clamp Includes M8 Hexagon screw and...

Страница 5: ...5 24x Joiner clamps Includes M8 Hexagon screw and fixing nut 1x Tube Cap 2x Angle adjustment arm 1x Beam 1x Post top 1x Post Base...

Страница 6: ...l Thread Includes 6x M16 Hexagon nuts 6x M8x12 Key bolts 12x M8x30 Hex bolt Includes M8 Hexagon nuts And washers 56x 25mm Tech Screw PLEASE NOTE STAINLESS STEEL BOLTS WILL BIND UP OCCASIONALLY APPLY G...

Страница 7: ...double the width measurements for soft sandy ground and pre pour a thick layer of concrete into the bottom of the hole and place the post base onto this Ensure post is straight and level before conti...

Страница 8: ...on to be bolted to pre set bolts in a concrete floor or block if desired Position post over bolts and tighten down Attach post top to post base with 4 bolts nuts washers provided Continue to Array Bui...

Страница 9: ...e Cap on the Pole and position with the two adjuster mounting holes facing south Tighten the six M8 key bolts to maintain the correct position so panels will face towards true North Tube Cap North Fac...

Страница 10: ...le Adjusters Place the 2 x angle adjustment tubes between the beam and the tube cap on the outside of each Fasten with the M16 All Thread and nuts once you select the angle desired see next page It is...

Страница 11: ...11 Adjust the angle of elevation by attaching the Adjustment Tubes to the hole positions required corresponding to the required angle Please refer to the illustration below...

Страница 12: ...ce the 3x sub frame rails 2600mm across the flanges on the Beam ensure the mid point of the rail is centre to the beam Lightly fasten the brackets with M8 bolts leaving loose at first then tightening...

Страница 13: ...ogether as outlined below Mark a centre line on the small joiners Slide one end into one length of rail Fix Tek screws through the rail and into the joiner make sure to avoid the screws protruding int...

Страница 14: ...d no closer than 10mm from any edge Align the centre of the join with the mid point of the middle Sub Frame rail and clamp BOTH SIDES with the joiner clamps Ensure ALL edges are square and evenly plac...

Страница 15: ...the array Use end and mid clamps to attach solar panels to the rails Clamps are inserted from above see below With the array at an angle of 0 flat place the first two panels centre and then place the...

Страница 16: ...inue with subsequent rows Fix end clamps on outside of final modules Once fitted with the required number of solar modules be sure to double check tightness of all mechanical fixings Adjust array for...

Страница 17: ...ules The clips are made from high quality stainless steel and offer a long lasting solution to untidy cables They clip directly to the module frame underside edge and are simple to install and remove...

Страница 18: ...tandards GB50009 2001 GB50011 2001 GB T 13912 92 GBT 14846 2008 GB T 6892 2006 GB50429 2007 GB50017 2003 AS NZS 1170 ASCE SEI 7 05 ASCE SEI 7 010 2007 California Administrative Code IBC 2006 Euro Code...

Страница 19: ...cluding lost profits resulting from any cause whatsoever arising out of or relating to the installation or commissioning of any product sold This warranty does not cover products altered modified or u...

Страница 20: ...ctural and loading ratings and are only to be used and installed as per instruction manuals provided ANY alteration on design or installation voids all warranty Any overloading of array structure and...

Отзывы: