Maintenance Checklist
CHECK
OK / NOTES
Installation –
use Installation Checklist on previous page to check all services, operator training
and chemical issues
Services
water, power, drain etc.
Operator
trained / has instructions
Chemicals
squeeze tube checked – replacement
recommended every 6 months,
product type, container, leaks etc.
General conditions
Cleanliness of machine
daily maintenance
Presence of pests
Leaks
Operation
Temp
°C
Amps
Elements Wash
60
Rinse
83
Pumps Wash
n/a
Rinse
n/a
Drain
functional
n/a
Water Flow
Wash arms and jets
jets clear, good rotation, bushes OK
Rinse arms and jets
jets clear, good rotation, bushes OK
Cycle
Fill levels
pressure switch settings
Drain operation
upstand/pump
Noise sounds
OK
Recovery between cycles
Controls
Door switch
including auto start if fitted
Switches, lights, gauges
all sound and functional including door/s
Performance
Wash and rinse
effective
Electrical
Safety test
if required
Cabinet
Door / Handle / Catch
operational
Rack slide
good rack entry / withdrawal
Comment / Action Required
Model / Serial
Technician
Owner
Signed
Location
Date
Service Manual XP-2
9
Revision 1C
Содержание XP
Страница 1: ...XP PASSTHROUGH DISHWASHER ServiceManual...
Страница 6: ...Service Manual XP 2 6 Revision 1C...
Страница 7: ...Service Manual XP 2 7 Revision 1C...
Страница 26: ...Service Manual XP 2 26 Revision 1C...
Страница 27: ...Service Manual XP 2 27 Revision 1C...
Страница 28: ...Service Manual XP 2 28 Revision 1C...
Страница 32: ...Service Manual XP 2 32 Revision 1C...
Страница 33: ...Service Manual XP 2 33 Revision 1C...
Страница 36: ...Service Manual XP 2 36 Revision 1C...
Страница 37: ...Service Manual XP 2 37 Revision 1C...