
30
Installation manual
14. Sign and date one of the STICKER B (Conversion Record) and apply it on the right side panel adjacent to the
gas valve.
15. Reinstall the lower panel.
H
fig.W01630
H
Apply STICKER B Here
Leak Check
1. Turn on gas supply.
2. Plug in dryer or reconnect power.
3. Set dryer cycle to time high heat and turn on dryer.
4. Brush or spray an approved noncorrosive leak-detection solution onto pressure tap and union nut (if applicable)
and inspect for leaks indicated by growing bubbles.
5. If any bubbles are present, turn off gas supply, tighten the leaking connection and retest for leaks.
6. If dryer was moved during conversion, use the same method to check for leaks in the flexible gas supply line and
fittings between the dryer and the gas supply pipe.
7. If any bubbles are present, tighten the leaking connection and retest for leaks.
8. Unplug dryer or disconnect power.
Содержание SD-12E
Страница 1: ...Installation manual Tumble dryer SD 12E SD 12G Original instructions 0180500987C EN 2022 09 02 ...
Страница 2: ......
Страница 4: ......
Страница 38: ......
Страница 39: ......
Страница 40: ...Electrolux Professional AB 341 80 Ljungby Sweden Share more of our thinking at www wascomat com ...