![WÄRTSILÄ JOVYATLAS POWERMASTER S 6000 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/wartsila/jovyatlas-powermaster-s-6000/jovyatlas-powermaster-s-6000_operating-manual_873376015.webp)
JOVYATLAS POWERMASTER S 6000-P BAX 4469 E
- 15 -
7
Commissioning the UPS
7.1
Commissioning the single UPS
Take note:
The unit fans run as soon as the input voltage is applied!!
Make sure that UPS has been installed correctly. The battery pack has to be connected via battery
connector to the battery jack on rear side of the ups. Make sure that the input- and output switches have
been switched off.
Summary:
1. Make sure that the ups has been connected correctly.
2. Close Output Breaker.
3. Close Input Breaker, the Message “UPS Initialization” will appear in Display.
4. Wait 30 seconds until the output voltage is stable.
-
The LED “BYPASS” will light.
-
The Display will show the Message: “BYPASS MODE”.
5. Now switch on the connected Load.
6. Push Button “MENU/ENTER” to choose Menu “UPS Command”.
7. Push Button “MENU/ENTER” to choose Menu “Start UPS ON/OFF”.
8. Push Button “MENU/ENTER” to choose Menu “UPS runs to ON-LINE”.
9. Push Button “MENU/ENTER” to start the UPS.
-
The Message: “LINE MODE” appears on Display.
7.2
Shutting-down the single UPS
1. Push Button “MENU/ENTER” to choose Menu “UPS Command”.
2. Push Button “MENU/ENTER” to choose Menu “Start UPS ON/OFF”.
3. Push Button “MENU/ENTER” to choose Menu “UPS runs to Bypass”
4. Open all external Switches
5. Open Output Breaker
6. Open Input Breaker
-
All Display Announcements and LED are dark
P L E A S E N OT E!
The unit should be started over the input mains. If the input mains is not available for a short
time then it is also possible to start the unit over the external battery. It is a basic prerequisite for
this operating mode that the UPS unit was one time operated over the energy supplier’s mains
network. Please note that when starting over the external battery, the maximum time the output
voltage is available to you is the autonomy time. The UPS unit will also start with the planned
parameter, that is if the mains previously had 50 Hz then the UPS will also produce 50 Hz on the
output side.
P L E A S E N OT E!
The voltage specification on the UPS must coincide with the voltage specification on the battery cabinet
(DIRECT CURRENT LINK VOLTAGE) otherwise there is danger of destroying internal components of
the UPS or destruction of the battery.