6
6. Installation
Installation :
1.
Place the welding machine in the room where there is no straight sunlight, no rain,
less dust, low humidity ,and temperature range of 0° - 50°C.
2.
The gradient of ground must not be more than 15°
3.
Ensure no wind at the welding position, or use screen to block the wind.
4.
The distance between welder and wall must be more than 300 mm.
5.
Connect the 3 phase Input supply to the machine. Supply voltage must be in the
range of 400 V +_ 10% as mentioned in the Technical specification of this
manual.
6.
Power supply:
The size of fuse and breaker in the table are for reference :
7.
Connect the electrode holder to the +Ve terminal & earthing cable to the +Ve terminal of the
machine
8.
Connect remote controller (If needed).
**************
Product type
INARC 400 I
INARC 630 I
Power supply
3 phase AC 400 V
Min. power capacity
18.4KVA
35KVA
Input
protection
Fuse
30A
63A
breaker
32A
63A
Min.
Cable
size
Input side
4mm
2
6mm
2
Output side
50mm
2
70mm
2
Earth lead
4mm
2
6mm
2
Содержание INARC-400 I
Страница 15: ...6 INSTALLATION DIAGRAM OF INARC 400 I ...
Страница 22: ...12 Wiring Diagram ...
Страница 25: ...SPARE PARTS IN DETAILS TOP VIEW SIDE VIEW LEFT ...
Страница 26: ...SIDE VIEW RIGHT FRONT VIEW 1 ...
Страница 27: ...FRONT VIEW 2 ...