
29 March 2021
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm
………….
Copyright ©
28
DIAGRAM B ( SHOWING CONTROL VALVE WITH TEST POINTS AND ADJUSTING SCREW )
DIAGRAM B
Modulator Harness
Connections
Modulator Harness Connections
Nut A
Screw B
•
After checking the pressure, turn the unit off, remove Manometer from the test point and tighten the test point screw.
Ensure to check for gas leaks.
•
Ensure power is off & reconnect Modulator harness connection in the main harness. See Diagram B above.
•
Turn the appliance on and off a few times to check ignition.
•
When you are satisfied that the appliance is working correctly, fit the front panel back to the Gas Burner.
•
NOTE:
Ensure you peel the protective plastic coating from any Stainless Steel components if fitted.
•
All Burner aerations are factory preset and cannot be adjusted.
•
If you are unable to get the unit to operate correctly, refer to troubleshooting before contacting your Local Service
contact.
•
It may take approximately 2 hours of operation for the coals/logs or river rocks to achieve their full flame pattern and
glow.
•
During the initial burning period, some smoke and smell may be experienced. The appliance should be run on the
high position in a well ventilated room until these dissipate.