background image

 

1  WARNING 

1.1 Weather-tightness 

  Installation  of  the  flashing  kit  supplied  with  in-roof  mounting  kits  should  only  be 

undertaken by trained, experienced roofing professionals. 

  It is the responsibility of the roofing professional to ensure the suitability of the flashing 

supplied for the specific installation and roof type and to ensure the weather-tightness 
of the installation. 

  A continuous vapour barrier 

MUST

 be installed beneath the collector array, extending 

down  to  the  guttering,  to  prevent  moisture  ingress  to  the  building  in  the  event  of 
leakage of the flashing. 

  No claim for consequential loss or damage arising as a result of a defect of the flashing 

or its installation shall be accepted by the manufacturer. 

 

2  INSTALLATION 

2.1 General Requirements 

Select a suitable position for the collector.  Ensure the section of roof to which the collector is 
being installed is capable of supporting its weight and any likely wind and snow loads. 

The collector should face as close as practicably possible towards south and not be shaded 
by surrounding buildings, trees or other sections of the building to which it is being installed.  
The collector must be installed on a section of roof with a 

tilt of between 15° and 90° to the 

horizontal

.    Table  1  shows  the  effect  of  the  tilt  and  orientation  of  the  collector  on 

performance. 

Tilt of 

collector 

Orientation of collector 

South 

South-east 

South-west 

East / West 

North-east 

North-west 

North 

30° 

Recommended 

4.3% loss 

15% loss 

27% loss 

32% loss 

45° 

1.8% loss 

7.1% loss 

20% loss 

36% loss 

40% loss 

60° 

7.8% loss 

14% loss 

28% loss 

44% loss 

53% loss 

Data derived from SAP2009 

Table 1: Loss of performance due to collector angle and orientation 

In-roof kits are available for fitting the collector to both tiled and slate roofs: 

  tiled in-roof installation (refer to Section 2.2) 

  slate in-roof installation (refer to Section 2.3) 

 

 

 

IMPORTANT

 

Fill, flush and leak test the system 

PRIOR

 to installing the flashing 

around the collector. 

Отзывы: