Page
42
6.5 Remote Timers for Combis
6.5.1 Installation of a remote two channel programmer (option 1)
Permanent Live Supply
The boiler
must
be supplied with a
permanent live mains supply via a
fused isolator connected to the
boiler 3 pin mains plug into the
control panel.
Failure to connect a permanent live
to the boiler will prevent the
programmer, boiler mains lamp and
pump overrun thermostat from
operating. It will also disable the
built-in frost protection of a Kabin
Pak Combi.
Connecting the Programmer
Inside the boiler control panel,
remove the purple, white and brown
wires connecting the CH and HW
switches to the 6 pin connector of
the terminal block.
Connect the programmer to the 6 pin connector via a 5 core cable as shown
ensuring the earth is connected to one of the earth posts inside the control panel.
On Kabin Pak models, ensure the frost thermostat connections to pins 3 and 6 are
left in place.
Connecting the programmer in this manner will bypass the CH and HW on/off
switches on the boiler control panel. The boiler and programmer will both be
powered from the boiler 3 pin mains plug, so only one mains connection is
required.
The neutral connection to the 3-pin plug on the control panel must be the
sole mains neutral connection to the appliance.
Содержание BoilerhouseB70HE
Страница 13: ...4 5 2 U Series Utility Casing Components Models up to 120 HE 150 HE Models Page 11...
Страница 14: ...4 5 3 U Series Utility Pre Wired UHE Key Components Models up to 120 HE 150 HE Models Page 12...
Страница 15: ...4 5 4 U Series Utility Pumped UPHE Key Components Models up to 120 HE 150 HE Models Page 13...
Страница 16: ...Page 14 4 5 5 U Series Utility System USHE Key Components 4 5 6 U Series Utility Combi UCHE Key Components...
Страница 17: ...4 5 7 K Series Kabin Pak Casing Components Models up to 120 HE 150 HE Models Page 15...
Страница 18: ...4 5 8 K Series Kabin Pak Pre Wired KHE Key Components Models up to 120 HE 150 HE Models Page 16...
Страница 19: ...4 5 9 K Series Kabin Pak Pumped KPHE Key Components Models up to 120 HE 150 HE Models Page 17...
Страница 22: ...Page 20 4 5 13 Combi Pipe Layout UCHE KCHE Models...
Страница 23: ...Page 21 5 TECHNICAL DETAILS 5 1 Combi Sequence of Operation Flow Chart...
Страница 25: ...Page 23 5 2 3 U Series Utility 150HE Models 5 2 4 U Series Utility UCHE Models...
Страница 27: ...Page 25 5 2 7 K Series Kabin Pak 150HE Models 5 2 8 K Series Kabin Pak Base Tray 150HE Models...
Страница 28: ...Page 26 5 2 9 K Series Kabin Pak KCHE Models 5 2 10 K Series Kabin Pak Base Tray KCHE Models...
Страница 41: ...Page 39 6 3 2 Wiring Schematic...
Страница 66: ...Page 64 8 1 10 Kabin Pak Plume Management Kit KPMK The kit comprises...
Страница 78: ...Page 76 13 BURNER FAULT FINDING 13 1 Riello RDB...
Страница 79: ...Page 77 14 COMBI FAULT FINDING 14 1 Central Heating...
Страница 80: ...Page 78 14 2 Domestic Hot Water...
Страница 91: ......