
Str. 17
INS_14092022
CONNECTION TO THE PLUMBING SYSTEM
The connection to the plumbing system should be made in accordance with PN-76/B-02440.
The tank is a pressure device adapted to connect to the water supply system, the maximum pressure of the
tank is 0.6
MPa, and the maximum pressure of the
coil is 0.6 MPa
, if the pressure
in the water supply system
exceeds this value, a pressure reducer should be installed before the tank.
The tank must be connected to the water supply network as follows:
•
A non-return valve should be installed on the water supply side to avoid the flow of water from the
tank side
•
to the cold water supply port, install a tee with a safety group including a diaphragm vessel
and a
safety valve
with an opening pressure of 6 bar; there must be no shut-off valve or throttling
element between the tank and the safety valve and at its outlet, the safety valve must be mounted
in such a way that water leakage is visible,
•
connect the exchanger with the installed safety valve to the water supply system,
•
On the supply of cold water install a shut-off valve.
The domestic hot water outlet should be connected to the connector, which is located on the upper part of
the exchanger.
Circulation should be plugged in according to the scheme.
Suggestedconnection chemat:
Содержание ZC-02
Страница 1: ...INSTALLATION AND OPERATING INSTRUCTIONS Tank 2in1 Models ZC 02 ZC 0 25 ZCC 025 ZC 05 ZCC 05 ZC 10...
Страница 2: ...Str 2 INS_14092022...
Страница 6: ...Str 6 INS_14092022 Tank construction 200 ZC 02...
Страница 7: ...Str 7 INS_14092022 Tank dimensions 200 ZC 02...
Страница 8: ...Str 8 INS_14092022 Construction TankA 250 ZC 025...
Страница 9: ...Str 9 INS_14092022 Tank dimensions 250 ZC 025...
Страница 10: ...Str 10 INS_14092022 Construction of tank 250 with two coils ZCC 0 25...
Страница 11: ...Str 11 INS_14092022 Tank dimensions 250 with two coils ZCC 025...
Страница 12: ...Str 12 INS_14092022 Tank construction 500 ZC 05...
Страница 13: ...Str 13 INS_14092022 Tank dimensions 500 ZC 05...
Страница 14: ...Str 14 INS_14092022 Tank dimensions 500 with two coils ZCC 05...
Страница 15: ...Str 15 INS_14092022 Construction of Tank 500 with two coils ZCC 05...
Страница 16: ...Str 16 INS_14092022 Dimensions and construction of the tank 1000 ZC 10...
Страница 22: ...Str 22 INS_14092022...
Страница 23: ...Str 23 INS_14092022 PRODUCER ENERGIA ON SP Z O O MIKOLAJA REJA 13 15 1101 81 874 SOPOT WARME COM PL...