background image

 

 
 

Str. 17

 

 

OPERATION 

 

Tanks are safe and reliable provided that the following rules are observed: 

 

do not operate the tank without a working safety valve, 

 

the operation of the valve should be checked every 14 days by turning the cap 
so that there is a slight discharge of water, 

 

it is recommended to thermally insulate the discharge pipe and the coil 
connection pipes to reduce heat loss, 

 

Any irregularities in the operation of the device should be reported to the 
service facility. 

These activities are at your own expense and are not subject to warranty. 

 

 

TECHNICAL SPECIFICATIONS 

 

 Tank buforowy

 

BR-005

 

BR-01

 

BR-02

 

BR-025

 

BR-05

 

 Rated

 capacity

 

l

 

50

 

100

 

170

 

245

 

454

 

 Energy

 efficiency

 

 

A

 

A

 

B

 

B

 

B

 

 Rated

 pressure

 

Mpa

 

0,4

 

 Rated

 temperature

 

°C

 

95

 

Net weight

 

Kg

 

35

 

50

 

60

 

70

 

90

 

 

 

 

 

 

 

 

 

Содержание BR-005

Страница 1: ...INSTALLATION AND OPERATING INSTRUCTIONS INSTALLATION AND OPERATING INSTRUCTIONS Buffer tank BR 005 BR 01 BR 02 BR 025 BR 05...

Страница 2: ...Str 2...

Страница 3: ...Buffer construction 200 BR 02 10 Buffer dimensions 200 BR 02 11 Construction of the BR 025 buffer 12 Buffer dimensions BR 025 13 Construction of the BR 05 buffer 14 Buffer dimensions BR 05 15 CONNECT...

Страница 4: ...rking with the device health and safety rules and other regulations in force in a given country should be observed 4 The device must not be installed in rooms where the ambient temperature may fall be...

Страница 5: ...designed for storing heating water in cooperation with heating boilers and heat pumps Appendixe application is the function of distributor hydraulic separator heating circuit from the boiler room An e...

Страница 6: ...Str 6 Buffer dimensions 50 BR 005...

Страница 7: ...Str 7...

Страница 8: ...Str 8 Construction buffer 100 BR 01...

Страница 9: ...Str 9 Buffer dimensions 100 BR 01...

Страница 10: ...Str 10 Buffer construction 200 BR 02...

Страница 11: ...Str 11 Buffer dimensions 200 BR 02...

Страница 12: ...Str 12 Construction of the BR 025 buffer...

Страница 13: ...Str 13 Buffer dimensions BR 025...

Страница 14: ...Str 14 Construction of the BR 05 buffer...

Страница 15: ...Str 15 Buffer dimensions BR 05...

Страница 16: ...Before starting the buffer tank it is necessary to visually check the correctness of the device connection Check the tightness of the connections Check the operation of the safety valve according to...

Страница 17: ...ecommended to thermally insulate the discharge pipe and the coil connection pipes to reduce heat loss Any irregularities in the operation of the device should be reported to the service facility These...

Страница 18: ...ted as municipal waste Proper disposal of the used product prevents potential negative effects on the environment that could occur in the event of improper waste management For more detailed informati...

Страница 19: ...Str 19...

Страница 20: ...Str 20 PRODUCER ENERGIA ON SP Z O O MIKOLAJA REJA 13 15 1101 81 874 SOPOT WARME COM PL...

Отзывы: