Installation
Page 4 | 8
2021216 [Rev. 2 - en]/2017-04-19
2.4
Installing the lateral profiles (P1/2.Q.23)
Hold the mounting pro-
file (one side) in the re-
veal. Watch the edge
distances.
Transfer the drill hole
position.
Drill the fixing holes.
Attach the mounting
profile.
D1
D2
H
A
Align the mounting pro-
file (second side) with
the mounted side.
Check the height (H),
alignment (A) and diag-
onals D1 and D2.
Attach the mounting
profile as described ear-
lier.
2.5
Installing the ceiling profile, base profile
and top guide rail
Attaching the ceiling profile
P1./2Q.20
Hold the ceiling profile
against the mounting
substructure. Take the
position of the base rail
into account.
Transfer the drill hole
position.
Drill the fixing holes.
Attach the ceiling pro-
file.
P1/2.Q.21/22
Align the ceiling profile
with the drilled holes in
the mounting frame.
Attach the ceiling pro-
file.
P1/2.Q.23
Hold the ceiling profile
between the mounting
profiles on the mounting
substructure.
Transfer the drill hole
position.
Drill the fixing holes.
Attach the ceiling pro-
file.
Attaching the base profile
P1/2.Q.20-23
Slide the fixing brack-
ets into the base profile
at the bottom on both
sides.
INFO
The fixing brackets at the bottom can be shifted
in the base profile. Do not drill through the fixing
bracket.
P1/2.Q.20
Hold the base profile
against the mounting
substructure. Align the
base profile with the
ceiling profile.
Slide the fixing brack-
et at the bottom against
the mounting substruc-
ture.
Transfer the drill hole
position.
Drill the fixing holes.
P1/2.Q.20-23
1
2
3
Pull the film off of the
adhesive tape.
Attach the fixing bracket
at the bottom.
Press the base profile
into place.
Installing the top guide rail
P1/2.Q.20-23
1
2
Slide the fixing brackets
into the top of the top
guide rail on both sides.
Secure the fixing brack-
ets with a threaded pin.