33
2.1 Prescriptions
When placing the fire-place and jointing the smoke tube side the fire protection
requirements of the relevant construction provisions must be taken into
consideration.
For the problem-free functioning of the equipment the chimney which the fire-place
uses must be in perfect condition.
2.2 Place of installation
As the air needed for burning is drawn from the room where the fireplace is located,
ensure that sufficient air supply is received via the gaps by the windows and external
doors. Make sure that 4 m
3
of air should be provided to each kW of rated
performance. For this fireplace, it means that the room has to be at least 20 m
in
volume. If the room is smaller, sufficient air supply can be secured by opening air
connections to other rooms with air openings (at least 150 cm
2
).
2.3 Distances
All the combustible materials, furniture or e.g. decoration materials that are in the
close environment of the fireplace should be protected from the heat.
Furnishing in the radiation area
Keep a minimal distance of
80 cm
(A) between the front edge of the fireplace and
the combustible equipment, furniture or e.g. decoration materials in the building. The
security distance can be reduced to
40 cm
(B) if a heat shield is placed in front of the
object to be protected (see example in Picture 7).
Furnishing beyond the radiation area
The walls beside and behind the fireplace may not be made of combustible
materials, and they cannot be covered with such materials if the distance
on the
sides is under 40 cm*
, or
30 cm
on the rear side
. Similarly, the distance to
wooden and plastic furniture on the sides should be at least
40 cm*
(see Picture 8).
* 65 cm
only
Typ 109 30 Calor S / Westminster S
Floor in front of and under the fireplace
pic. 7
pic. 8
Содержание 109 20
Страница 15: ...15 3 Technische Daten 3 1 Maßzeichnungen Daten CALOR S A CALOR A CALOR F A ...
Страница 16: ...16 CALOR DeLuxe ...
Страница 19: ...19 ...
Страница 20: ...20 ...
Страница 21: ...21 ...
Страница 22: ...22 ...
Страница 31: ...31 1 6 Potential problems and how to tackle them pic 3 pic 4 pic 5 pic 6 ...
Страница 36: ...36 3 Technical specification 3 1 Dimensional drawings CALOR S A CALOR A CALOR F A ...
Страница 37: ...37 CALOR DeLuxe CALOR DeLuxe NS ...
Страница 39: ...39 3 2 EC Declaration of Conformity ...
Страница 49: ...49 fig 3 fig 4 fig 1 fig 2 fig 5 fig 6 ...
Страница 54: ...54 3 Données technipues 3 1 Plans avec les dimensions Données CALOR S A ...
Страница 55: ...55 CALOR A CALOR F A CALOR DeLuxe ...
Страница 58: ...58 Gentilissimo Cliente I ...
Страница 69: ...69 fig 3 fig 4 fig 1 fig 2 fig 5 fig 6 ...
Страница 78: ...78 3 Schede tecniche 3 1 Disegno dimensionale e dati CALOR S A CALOR A CALOR F A ...
Страница 79: ...79 CALOR DeLuxe ...
Страница 90: ...90 1 6 Üzemzavar okok elhárításuk 3 kép 4 kép 5 kép 6 kép ...
Страница 95: ...95 3 Műszaki adatok 3 1 Méretrajz Műszaki jellemzők CALOR STANDARD CALOR CALOR ABLAKOS ...
Страница 99: ...99 ...
Страница 100: ...100 Art Nr xxxxxx Ausgabe 05 2011 ...