background image

A

Drive pipe into ground using one of 

the options illustrated at the top right.

B

Adjust bottom and top donuts to

compensate for crooked pipe.

C

Install vinyl post over donuts.

D

Pipe is crooked, but vinyl post

is straight and level.

After establishing your fence lines with

string and stake, drive your first pipe 

into the ground.  The bottom of the 

gear should sit just above the ground 

when finished.

Re-Install Top Donuts

Adjust bottom and top 

donuts to compensate 

for crooked pipe.

Distance from plastic

gear (not donut) to pipe

should be 70 3/8” (or center

to center of pipe at 72”).   

Slide vinyl posts down over donuts.

Slide second bracket over the opposite

end of the bottom rail and slide the rail

down into the pre-installed bracket on

the opposing side.     

Temporarily remove bottom rail and install bracket using screws.

Use a level on the top of the bottom

rail to determine height of opposing

bracket and mark for installation.

Install top brackets using screws.

Slide top and bottom rails down into the pre-installed 

brackets. Use screws to secure.

Install pickets by inserting through top rail and locking into the bottom rail. 

Trim down post tops as necessary and install post caps. 

Use pvc cement (not included) to secure permanently. 

1

2

3

4

5

9

10

11

12

13

Warning:  Pickets once

inserted into bottom rail

cannot be removed.

33in.

70 3/8in.

72in.

Install one bottom bracket on post using

screws (approximately 2” off the ground).

8

7

6

Identify location of 

your second pipe anchor 

and drive into the ground.

QUICK SUMMARY

 Try and drive the pipe as level as possible. Check level about every 12”.  After about

18” deep the trajectory of the pipe is usually established, and you cannot manually

pull the pipe back into level (donut will not compensate for severly crooked pipe).

Ground can be dug out about

3” to 4” to allow post bottoms

to sit below grade if necessary.

Note:  There could be a slight conflict between the head

of the exposed screws and end of rail in a tight fitting 

application. End of rail can be notched to accommodate

Install ONE complete 

panel of fence FIRST. 

Then proceed to install 

only one or two pipe 

anchors at a time, until 

you fully understand 

the fundamentals. 

This will help you to 

avoid repetitive mistakes.

Purchase post pounder at any hardware store or go to: www.wambamfence.com.   Post pounders cost roughly $25 to $30 at Hardware Store

(or rental stores often have for rent).    Inside diameter of post pounder should be 3" diameter minimum.

5lb Sledgehammer

10lb Sledgehammer

Post Pounder

Hammer

GOOD

BETTER

BEST

TOOL OPTIONS FOR DRIVING PIPE INTO GROUND

DO NOT USE

2in.

2

3

Отзывы:

Похожие инструкции для BL19101