WWW.
WAMBAM
FENCE.COM
19
ASSEMBLY
INSTRUCTIONS
AF14004
STEP 9:
INSTALL
RAIL BRACKET
STEP 9.1
STEP 9.2
Using the Rail Bracket
(A)
, measure about
2” off the ground. Pre-drill a ⅛” hole into the
proper side of the post, through the post
itself, and into the pipe anchor inside.
Attach the rail bracket with a 5/8” self-drill
-
ing stainless steel screw. If you force the
screws, you will strip them.
A
2”
STEP 9.3
Install the top and middle rail bracket. The
distance between the bottom of the bottom
bracket and the bottom of the middle bracket
should be 46”. The distance between the bot-
tom of the middle bracket and the bottom of
the top bracket should be 7”. Repeat with (3)
rail brackets on the opposite post.
7”
46”