Waltons 01GRODB0808-V2 Скачать руководство пользователя страница 1

01GRODB0808-V2

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

8x8 Dutch Barn Shed Double doors with window

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, it is advisable to 

pilot drill all screw holes and ensure 

all screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(

not supplied) 

including

 

 a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather

conditions. For the duration of heavy or extended periods of rain, swelling of the

wood panels may occur. Warping of the wood may also occur during excessive

dry spells due to an interior moisture loss. Unfortunately, these processes cannot

be avoided but can be helped. It is suggested that the outdoor building is

sprayed with water during extended periods of warm sunshine and sheltered as

much as possible during rain or snow.

Our buildings are coated with a water based high quality colorant**; this only 

helps to

protect the product during transit and for up to 3 months against mould. To

validate your guarantee and ensure longevity of the product, it is ESSENTIAL the

building is treated with a wood preserver within the first three months of

assembly and thereafter in accordance with the manufactures recommenda-

tions.

Care must be taken to ensure the product is placed on a suitable base

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens products 

independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

01GRODB1008-V2

10x8 Dutch Barn Shed Double doors with window

Refer to the instructions pages for you specific product code

Содержание 01GRODB0808-V2

Страница 1: ...r guarantee and ensure longevity of the product it is ESSENTIAL the building is treated with a wood preserver within the first three months of assembly and thereafter in accordance with the manufactur...

Страница 2: ...n Panel Small Roof Qty 2 Large Roof Qty 2 Window Qty 2 12 13 14 15 16 17 18 19 20 Gable Strip 12x121x2300mm Qty 2 Cover Trim 12x25x1810mm Qty 4 Window Strip 12x45x1055mm Qty 2 Door Strip 12x45x1764mm...

Страница 3: ...ensure they are level at the top then fix together using 60mm screws Stagger the screws so they do not collide 60mm screw Pre drill hole 2 4 Line a Gable Strip up to the assembled gable ensuring the b...

Страница 4: ...rews Lay the Plain Back Panel and the remaining Gable Top on a level floor place the gable top on top of the plain back panel ensure they are level at the top then fix together using 60mm screws Stagg...

Страница 5: ...dow panel as shown in the diagram 3x30mm Screws SCREW COUNT PER WINDOW 6x30mm Screws 6x16mm Screws 4x30mm Screws Lay the window panel down on a flat surface before fitting the window strip and window...

Страница 6: ...e gable top rafters Fix panels into position using 4x30mm screws from the top of panel straight into the rafter Pre drill holes before hand Ensure the larger over hang on both panels are facing each o...

Страница 7: ...sing felt tacks at 100mm intervals Step 14 24 Step 15 Use 3x30mm screws to fix each cover trim 12x30mm screws 13 13 13 Step 16 Fit fascia boards to the front and the back of building using 3x40mm scre...

Страница 8: ...h the pre drilled holes before fixing Align Lock keep with lock and fix with screws provided Fig 2 Place door handle bar through the lock as in diagram fix door handle onto bar with the flat headed gr...

Страница 9: ...al the turn button catches the master door 2x30mm black screws These turn buttons help to keep your doors straight during high levels and low levels of moisture content in the air 30mm screw Pre drill...

Отзывы: