1

2

3

4

Felt 

tacks 

P 6

Please retain product label and instructions for future reference

             

Please retain product label and instructions for future reference

             

2

1

Step 11

Cut the felt (

No. 23

) into 2x strips and lay 

onto the roof, making sure to lay the felt 

from the rear of the building to the front 

as shown in the illustration.

*Ensure there is approximatley 50mm

of overhanging felt around the building.

Once in position secure the felt to the roof

using 78x felt tacks.

78x Felt Tacks

Step 12

Arrange the cover strips (

No. 16

) at front 

and side(

s

) of the building and fix into

place using 3x30mm screws per strip.

*At the front of the building measure

the space between the roof & bottom

board and cut 2 cover trims to match.

12x30mm Screws  

Pre drill 

hole

30mm 

screw

16

16

16

16

**Trim off excess felt following the shape

of the roof.

15

14

14

13

13

Step 13

Secure the fascia’s (

No’s. 13, 14 & 15

)

around the top of the building using

40mm screws as shown in the 

illustration.

*Make sure to trap the felt between

the building and the facia.

19x40mm Screws  

Pre drill 

hole

40mm 

screw

Содержание 5x5 Corner Playhouse

Страница 1: ...ain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be hel...

Страница 2: ...PLAY0505 V1D Window QTY 2 AI 03FW540X1132 V1 Roof PI 03 Floor AI 02CORPLAY0505 V1F Panel Frame 28x28x1240mm FS2828 1240mm Eaves Frame 28x28x884mm QTY 2 FS2828 884mm Eaves Frame 28x28x1436mm QTY 2 FS28...

Страница 3: ...from the fixing kit as a guide to achieve the correct spacing Once in position fix the door to the door panel with the 3x hinges No 19 securing each hinge using 7x30mm black screws 21x30mm black screw...

Страница 4: ...ding to the floor until after the roof has been fitted 3x50mm Screws a b Pre drill hole 50mm screw 2 a b a a Step 5 Following the same method outlined in Step 4 fix the first window panel No 2 into po...

Страница 5: ...h each end of the ridge bar Once in place position the ridge bar between the gable and window panel securing into position using 2x30mm screws per side 4x20mm Screws 4x30mm Screws Pre drill hole 20mm...

Страница 6: ...re the felt to the roof using 78x felt tacks 78x Felt Tacks Step 12 Arrange the cover strips No 16 at front and side s of the building and fix into place using 3x30mm screws per strip At the front of...

Страница 7: ...een assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instructions for future reference 17 Step 13 Place the door knob...

Отзывы: