P 3
Step 2
2 x 50mm screws
Lay the Front Gable Left next to the Front
Top Gable, ensure they are level at the top
then fix together using 2x50mm screws.
Stagger the screws so they do not collide.
2
50mm
screw
Pre drill
hole
Line the Door Gable Strip up to the
assembled gable at the corners as shown in
the illustration and fix in place using 40mm
screws.
5x40mm Screws
40mm
screw
Pre drill
hole
Plain Gable Assembly
Step 3
12 x 50mm screws
Lay the Back Left Gable and Back Right
Gable on a level floor place them next to
each other, ensure they are level at the top
and bottom then fix together using
10x50mm screws. Stagger the screws so
they do not collide.
50mm
screw
Pre drill
hole
36
33
16
31
Turn the gable section over
and secure the top board in
place using 3x30mm
screws. Ensure to screw into
the framing, pre-drilling to
avoind splitting the board.
3 x 30mm screws
50mm
screw
Pre drill
hole