background image

01SHPWOR2010DDOW-V1

20X10 SHIPLAP WORKSHOP

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Protim Aquatan* T5 is a coloured, water-based concentrate which is diluted with water to make a solution 

for application to unseasoned timber. Protim Aquatan T5 treated wood is not protected against wood 

destroying insects or wood decaying fungi. Further preservative treatment is required to protect against 

these organisms.

Contains: Boric Acid, Sodium Hydroxide 32% solution, aqueous mixture of sodium dioctyl sulphosuccinate & 

alcohols: 2,4,6-Trichlorophenol.

Hazard Statements:

H315: Causes skin irritation.

H319: Causes serious eye irritation.

H412: Harmful to aquatic life.

Wear gloves when handling freshly treated wood. 

Avoid breathing dust when cutting treated or untreated wood. 

Dispose of off-cuts responsibly – do not burn.

IF SKIN IRRITATION OCCURS: Get medical advice/attention.

IF IN EYES: Rinse cautiously with water for several minuets. Remove contact lenses, and continue rinsing. If 

the irritation persists: Get medical advice/attention.

DO NOT INGEST.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

Содержание 20X10 SHIPLAP WORKSHOP

Страница 1: ...ols at hand not supplied including a Phillips screwdriver Stanley knife wood saw step ladder and drill with 2mm bit Ensure there is plenty of space and a clean dry area for assembly TIMBER As with all...

Страница 2: ...4 18 19 Finial Qty 2 26 23 T Hinge Qty 9 Felt 27 casement stay QTY 3 Butt hinge QTY 6 Open Window QTY 3 29 25 30 Rim Lock Handle 24 Tower Bolt QTY 2 28 7 11 Master Door Slave Door 12 16 Door Gable Str...

Страница 3: ...crews 5x40mm Screws 40mm screw Pre drill hole Plain Gable Assembly Step 3 12 x 50mm screws Lay the Back Left Gable and Back Right Gable on a level floor place them next to each other ensure they are l...

Страница 4: ...ole 9 Step 4 Do not secure the building to the floor until the roof is fitted Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and c...

Страница 5: ...with 50mm screws as shown in diagram 6x50mm Screws 50mm screw Pre drill hole Step 8 2 1 3 6 6 Cut down trims to fit Measure the length of the door gable rail and cut down a strip match Fix in place u...

Страница 6: ...10 30mm screw Pre drill hole Step 11 Place a Truss central to where two panels join Align the top of the truss with the top of the sides as shown in the diagram HINT Use a piece from the fixing kit a...

Страница 7: ...drill hole Place the fist two roof sheets ontop of the plain gable and truss making sure the roof sheet sits into the gables and truss securing using 40mm screws Ensure there is an eqal amount of over...

Страница 8: ...hole HANDLE WITH CARE 1 2 3 4 245 x felt tacks Cut four strips of felt and place onto the roof See below for sizes Place the felt flat onto the roof in the order that is stated on the diagram below On...

Страница 9: ...bles join using 4x40mm screws Pre drill to avoid splitting 34x40mm Screws 19 17 17 40mm screw Pre drill hole Cut down trims to fit 16x40mm Screws Fit the fascias to the roof over the felt and secure i...

Страница 10: ...se the butt hinges to attach the opening window strip and the opening window together Use 30mm screws to fix the butt hinge to the Window Strip and 16mm screws to fix it to the Opening Window If you w...

Страница 11: ...ck onto internal horizontal framing ensure alignment with the pre drilled holes before fixing Align Lock keep with lock and fix with screws provided Do not over tighten the screws otherwise the lockin...

Страница 12: ...ed AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Fix pad bolt to the side door with 6x30mm screws to side door along the horizontal door brace Then fix the p...

Отзывы: