Посетите наш сайт, чтобы бесплатно скачать руководство по продукту Walton 04LEAN0804-V1. На нашем сайте вы найдете все необходимые инструкции для этого товара. Скачайте его бесплатно прямо сейчас с нашего manualshive.com.
It is highly recommended that you should
apply wood treatment immediately after
the building has been assembled.
Step 13
Pre drill holes from the shed panel
top (8) straight into the green house
roof panel. Use 4x70mm screws.
70mm
screw
Страница 1: ...base BUILDING A BASE When thinking about where the building and base is going to be constructed Ensure that there will be access to all sides for maintenance work and annual treatment TYPES OF BASE Co...
Страница 2: ...and level base ensure base has suitable drainage free from areas where standing water can collect see front page on base requirements Ensure the base is square and fix together with 2 x 70mm screws p...
Страница 3: ...p of the roof panel Fix the window block with 2 x 70mm screws Place the small hinge 12 as in diagram and fix with 30mm black screws Position SD casement stay 14 onto the window fix the stay and pins w...
Страница 4: ...house If you are unsure on the fixings you require then we recommend that you consult with your local builders merchant or a knowledgeable DIY store 17 04GRECOM0808 V1 Assembly Requires 001MODP0804 V1...
Страница 5: ...ommended that you should apply wood treatment immediately after the building has been assembled Step 13 Pre drill holes from the shed panel top 8 straight into the green house roof panel Use 4x70mm sc...