background image

942-101 Switch Machine  © 2017 Wm K Walthers Inc Milwaukee WI 53218       Printed in China     10 

1)  Temporarily mount turnout using the centering yoke to lock points at center. 
2)  Use #57 bit (from 942-140 Drill Set) and drill hole in center of throwbar through 

roadbed and benchwork. 

3)  Drill two alignment holes on throwbar centerline.  For Walthers Code 83, Shinohara, 

Atlas Code 83, and Peco Code 83 use the two outer holes in the throwbar as a 
guide.  These holes are used to transfer the throwbar alignment to the bottom of the 
benchwork and later will be covered with ballast or scenery. 

4)  Remove the turnout, then from under the benchwork, draw a center line between 

and beyond the alignment holes drilled earlier. 

5)  Using the #57 bit, a small nail or a map pin, poke a hole thru the center point of the 

supplied mounting template.  Peel the backing from the template and use the pin to 
locate the center point with the center hole drilled in step two.  Orient the template 
so the alignment line matches the center line drawn in step 4 and press into place. 

6)  Use #43 bit (from the 942-140 Drill Set) drill pilot holes for the four mounting 

screws.  You may also drill out the center hole with the 3/16” drill from the drill set to 
facilitate the next step. 

7)  Drill up from the bottom with the stepped bit from the 942-140 Drill Set to enlarge 

the center hole to sufficient clearance (3/8 ” / 9 mm for HO) at the top surface.    
The hole may be larger on the bottom due to the steps in the bit. 

8)  Clean up the center hole on the top of the benchwork, then reinstall the turnout 

leaving the centering yoke in place.             (Continued on other side)    

942

942

942

942----101 SWITCH MACHINE 

101 SWITCH MACHINE 

101 SWITCH MACHINE 

101 SWITCH MACHINE 

MOUNTING INSTRUCTIONS

MOUNTING INSTRUCTIONS

MOUNTING INSTRUCTIONS

MOUNTING INSTRUCTIONS    

WALTHERS

® 

!!!!

Отзывы: