background image

Assemble the 1

st

 stage impeller.

 

Assemble intermediate chamber.

 

Assemble the 2nd stage impeller.

 

Tighten up the stud bolt.

 

 

Install O-ring onto pressure tank. 

(make sure it is clean)

 

Install the pressure tank. 

(arrow on top position)

 

 

 

10 

12 

11 

Отзывы: