background image

L2

Input power

Grounding

L1

L2

Input power

Grounding

L3

L1

Single-phase power supply

3-phase power supply (check if rotation is correct)

Fig. 1

VII. Starting

1. Before starting, the pump must be primed. 

Please follow the procedure as shown in Fig 2. 

a. Remove the filling plug

b. Fill water in chamber

Water

c. Replace the filling plug

Fig. 2

2. Installation where the pump inlet is below 

the water supply, remove the priming plug 
and allow the water to flow into the priming 
chamber until all air is expelled. 

3. The priming procedure should be repeated 

until all air is expelled and the pump delivers 
a full stream of water without air bubbles. 

4. The pump must always be checked for 

prime if not used for a prolonged period. It is 
imperative to fill the pump with liquid before 
operation as dry running causes irreparable 
damage to the mechanical seal. 

5. When 3-phase motor is supplied, please 

ensure if the rotation is correct. You can 
switch any of the 2 wires to get your desired 
rotation. 

VIII. Precautions

1. The pump should be shut down and the 

trouble corrected if the pump is running at 
speed and found to have any of the following 
problems:

   - No liquid discharged - Not enough liquid         

discharged

   - Excessive vibration - Motor runs hot
2. Do not allow the pump to continually start 

and stop (cycling) as this will reduce the 
motor life.

3. Cycling can occur on pressure units when 

the pressure tank pre-charge drops, or 
where there is a leak in the discharge 
plumbing. 

~ 3 ~

Suction

Discharge

Содержание TQCN1500

Страница 1: ...ISO 9001 Certified 50Hz Walrus Pump Co Ltd TQCN Series Instruction Manual HOT WATER PUMP TQCN Series...

Страница 2: ...Model TQCN Series Conform to the following directive 2006 42 EC Machinery directive 2006 95 EC Low voltage directive 2004 108 EC EMC Electromagnetic compatibility directive Refer to the following stan...

Страница 3: ...outdoor installation must covered by tent IV Piping 1 The suction line should be installed as short and straight as possible with a minimum of bends The internal diameter of the suction pipe must be...

Страница 4: ...4 The pump must always be checked for prime if not used for a prolonged period It is imperative to fill the pump with liquid before operation as dry running causes irreparable damage to the mechanica...

Страница 5: ...nd apply an accurate pressure gauge to the valve as shown in Fig 4 Pressure should be adjusted to the original pre charge as follows TQCN200 0 8 Kg cm 11 psi TQCN400 1 0 Kg cm 14 psi TQCN800 1 0 Kg cm...

Страница 6: ...t starts 2 If pump does not stop when no water is consumed adjust counterclockwise till it stops 3 After adjustment is made turn it on and off several times to make sure it operates normally TQCN 200...

Страница 7: ...stops Open and close a tap on the discharge several times to ensure that the pump starts and stops normally No further adjustments are neces sary TQCN 200 400 800 TQCN 1500 2200 3700 Fig 6 Warning Th...

Страница 8: ...conds or TQCN1500 2200 is programmed to stop after 15 seconds In addition the TQCN will be turned off in the event of dry run or over temperature alarm 4 What is the purpose of the built in pressure t...

Страница 9: ...TQCN 200 TQCN 400 TQCN 800 TQCN1500 2200 A mm 360 371 417 501 B mm 153 164 164 197 C mm 158 169 169 212 TQCN1500 2200 TQCN 200 400 800 C A 210 B 65 170 220 230 148 140 373 269 B A C 175 221 260 85 14...

Страница 10: ...the electricity supply Check if supply voltage is within 10 Follow IX of the Operation Manual Place a screwdriver against the shaft end of the motor to check it the rotor will spin freely and contact...

Страница 11: ...10...

Страница 12: ...mply with these instructions damage or breakdown caused by fair wear and tear negligence misuse incorrect installation inappropriate chemicals or additives in the water inadequate protection against f...