Wallbox Supernova Скачать руководство пользователя страница 6

10

11

Limited Warranty

•  Wallbox warrants this product against defects in materials and 

workmanship for a period of 3 years from the date of purchase.

•  During this period, at its discretion, Wallbox will either repair or 

replace any defective product at no charge to the owner.

•  Replacement products or repaired parts will be guaranteed for only the 

unexpired portion of the original warranty or 2 years whichever is greater.

•  Any defect resulting from any accident, misuse, improper maintenance, 

or normal wear and tear is not covered bzy the limited warranty.

•  Substitution or incorporation of any part by the client will be considered as incorrect usage.
•  Except to the extent permitted by applicable law, the terms of this limited warranty 

do not exclude, restrict, or modify, and are in addition to, the mandatory statutory 
rights applicable to the sale of the product to you. If you believe your product is 
defective, contact Wallbox for instructions on where to send or bring it for repair.

Type of construction:
External design:
Mounting method:
Installation location:
Location accesses: 

Intended for use:

Type of EV Supply Equipment 
 
 

Rated Voltage
Rated Frequency (fn)
Rated insulation voltage (Ui)
Rated impulse withstand voltage (Uimp) 

Temporarty Overvoltage
Rated peak withstand current (Ipk):
Rated conditional short-circuit current (Icc):
Rated diversity factor (RDF):
Pollution degree: 

Electromagnetic compatibility 
(EMC) classification:

EV supply equipment connection: 

Charging Mode: 
 

Intended Use
Fixed parts.
Floor-Standing Assembly
Stationary equipment mounted on concrete
Indoor and outdoor use.
Equipment for locations with non-
restricted access and restricted access.
Equipment intended for use by ordinary persons.

Electric Ratings
Regulated D.C. EV charging station by 
means of controlled current (up to 150A) 
charging D.C. output voltage rating 
category: 150 Vdc to 500 Vdc.
400V (-/+10%)
50Hz
1430 Vrms
2500 Vrms 

1500V
130 A
10kA
1
Pollution degree 3. Internally reduced 
to degree 2 in the main enclosure.
For emissions residential (Class B) 
and for immunity non-residential.

Electric Architecture
EV supply equipment (AEVCS) permanently 
connected to the AC mains supply network.
DC EV supply equipment Charging Mode 
4, both System A (Chademo) and System 
C (CCS), plus Case C connection.

Safety Instructions

Classifications and Ratings

GETTING STARTED

Safety Instructions

GETTING STARTED

•  In no event shall WALLBOX be liable for direct, indirect, special, incidental, or consequential 

damages arising from use or installation of any software or hardware described in this document.

•  This document is originally written in English. Other language versions are a translation of 

the original document and WALLBOX cannot be held liable for errors in the translation.

•  This document and parts thereof must not be reproduced or copied without 

written permission from WALLBOX, and the content thereof must not be 
imparted to a third party nor used for any unauthorized purpose.

Содержание Supernova

Страница 1: ...Supernova INSTALLATION MANUAL...

Страница 2: ...ed Tools 15 TRANSPORT AND UNPACKING 16 Transport 16 Unpacking 17 PRODUCT DESCRIPTION AND SITE PREPARATION 20 External view 20 Internal view 21 Site Space Requirements 22 Cable Reach 23 Table of conten...

Страница 3: ...ractable system 1 Weight Storage Temperature Operational Noise Level Humidity Operating Temperature Power Balancing Power Split Cooling System Charging Compliance Safety Compliance Cybersecurity Compl...

Страница 4: ...GERS S L U All rights reserved Copyright Nameplate Depending on the configuration of the charging station a nameplate will be located on the device Manufacturer Contact and Information GETTING STARTED...

Страница 5: ...main service power from the charger before cleaning the unit Do not use cleaning solvents to clean any part of the charger Clean it with a clean dry cloth to remove dust and dirt accumulation Use the...

Страница 6: ...ee Electromagnetic compatibility EMC classification EV supply equipment connection Charging Mode Intended Use Fixed parts Floor Standing Assembly Stationary equipment mounted on concrete Indoor and ou...

Страница 7: ...d ear injuries Workers need to be very careful when at risk C Heavy object risk of injurious strains Take into consideration that the components of Supernova can be very heavy Be careful when lifting...

Страница 8: ...x7 H Washer M16 x2 K Support Entry Plate L Membrane Entry Plate x5 Required Tools GETTING STARTED The following tools required for the installation of Supernova are recommended for the Supernovas ins...

Страница 9: ...ot to damage the charging point IMPORTANT Make sure that the charger is stable on the forklift before moving it Supernova can be transported also with a crane In this specific case remove the external...

Страница 10: ...harger L1 L2 L3 L4 L1 L2 L3 N PE PE Unpacking TRANSPORT AND UNPACKING 5 L1 L2 L3 L4 L1 L2 L3 N PE PE Unpack the EV guns and plug them in the holsters Then unpack the installation kit 6 Carefully lift...

Страница 11: ...cess Key Lock Air intake Product Label Equivalet for EV Cable 2 is located on the other side The images below show the different connections of the divide from the outside Internal view PRODUCT DESCRI...

Страница 12: ...cilitate possible maintenance operations The image below shows the recommended minimum distance needed to perform the installation 64 cm 38 cm 38 cm 38 cm Cable Reach PRODUCT DESCRIPTION AND SITE PREP...

Страница 13: ...4 L1 L2 L3 N PE PE Introduction L1 L2 L3 L4 L1 L2 L3 N PE PE L1 L2 L3 N L1 L2 L3 N PE PE L1 L2 L3 L4 L1 L2 L3 N PE PE Door and Keys Instructions PRODUCT DESCRIPTION AND SITE PREPARATION 2 1 4 3 L1 L2...

Страница 14: ...f the Supernova use the foundation kit template and concrete base To perform the electrical connection make sure not to cut the tube at the sole level to avoid the water penetrating into the charger i...

Страница 15: ...ling the base Civil Works MECHANICAL INSTALLATION 1 2 Dig a hole respecting the minimum dimensions of the template It is recommended to leave an extra volume around the template The resulting depth sh...

Страница 16: ...lean the excess of the product with some cardboard to spread it around 6 Let the product dry completely 7 At this point place the upper plate and place the charger using a forklift or a crane in corre...

Страница 17: ...it above the four rods that protrude from the ground 4 Close only the side door to facilitate the process IMPORTANT Close the doors carefully pushing them steadily to make sure that the electrical co...

Страница 18: ...L3 N L1 L2 L3 N PE PE L1 L2 L3 N L1 L2 L3 N PE PE Grid Connection ELECTRICAL INSTALLATION Assembly Part Size Quantity Tools recommended Electrical Cabinet 5 Screws M8 5 Hexagon socket wrench for M8 Ma...

Страница 19: ...irement in the data sheet L1 L2 L3 N L1 L2 L3 N PE PE Grid Connection ELECTRICAL INSTALLATION 5 Screw the crimped terminals to L1 L2 L3 N and PE 6 Before closing the electrical protection ensure that...

Страница 20: ...vervoltage protection of 20 Vn Nominal Voltage will be necessary The dimensions of the wiring must comply with the regulations and standards in force in the country of installation To calculate the mi...

Страница 21: ...nal screws on the sides of the Foot Covers Safety Torx for M6 REMEMBER The concrete shall never exceed the upper level plate to ensure that Supernova anchors on a flat surface Close all doors carefull...

Страница 22: ...42 43...

Страница 23: ...support wallbox com V 1 0...

Отзывы: