10
Circuit Protection
The EM530 is considered a continuously connected device, so it requires
an overcurrent protective device against current beyond the acceptable
rating of the equipment.
Connection of the meter
through a devoted breaker
CT clamps
Meter
Communication Line
There must be a wired communication line between the meter
and the charger. For this purpose, use STP Class 5E 1600 feet/500
meter Max Length.
1.
Ensure that the power is off before proceeding
with the connection.
• Use circuit breakers or fuses rated 20 Amps or less.
• The circuit breaker must protect L1 and L2, all the active phases.
• The circuit protection must comply with local standards.
• In case there is no free space on the panel, the power meter can
be installed in an external enclosure.
Installation
POWER METER INSTALLATION
Содержание Power Boost
Страница 1: ...Power Boost and Eco Smart Installation Guide North America ENERGY MANAGEMENT SOLUTIONS Version 1 0 ...
Страница 19: ...19 3 Using the down arrow button scroll to Ct rAt Measure 1 2 3 4 5 6 Installation POWER METER INSTALLATION ...
Страница 20: ...20 4 Press Enter 5 Scroll down to b 1 2 3 4 5 6 Installation POWER METER INSTALLATION ...
Страница 66: ...support wallbox com ...