![Wallbox Eco-Smart Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/wallbox/eco-smart/eco-smart_installation-manual_870754009.webp)
9
B.
Utility Meter
H.
Other House
Loads
I.
Wallbox
Charger
J.
Car
C.
Main Switch
A.
Grid
E.
Energy Meter
F.
Communication
G.
Breaker
D.
Eletrical Panel
Positioning and General Overview
Follow the scheme below for positioning the CT clamps and
the communication cable to charger.
Communication
cable to charger
Positioning
of CT clamps
Installation
POWER METER INSTALLATION
Содержание Eco-Smart
Страница 1: ...Power Boost and Eco Smart Installation Guide North America ENERGY MANAGEMENT SOLUTIONS Version 1 0...
Страница 18: ...18 2 Press the Enter button until you reach the Settings menu 1 2 3 4 5 6 Installation POWER METER INSTALLATION...
Страница 19: ...19 3 Using the down arrow button scroll to Ct rAt Measure 1 2 3 4 5 6 Installation POWER METER INSTALLATION...
Страница 20: ...20 4 Press Enter 5 Scroll down to b 1 2 3 4 5 6 Installation POWER METER INSTALLATION...
Страница 66: ...support wallbox com...