![Wallbox Copper Type 1 Case C Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/wallbox/copper-type-1-case-c/copper-type-1-case-c_installation-manual_3241029009.webp)
COPPER
- installation guide
en
9
Step 5: confirm the previous four steps.
Step 6: reconnect the cover communication cable, and close the front cover
taking special care of the fitting and that the O-ring sealing remains in place.
Step 7: Screw the six screws of the cover
Step 8: Insert the frame and screw the two screws.
One Phase Configuration
From left to right:
L1 (Current-carring conductor)
N: Neutral line
:Protective Earth
The presented color connection is not
subject to an international standard,
please always check the power supply
connection
Three Phase Configuration
From left to right:
L1,L2 & L3 (Current-carring conductors)
N: Neutral line
:Protective Earth
The presented color connection is not
subject to an international standard,
please always check the power supply
connection
HOLDER MOUNTING
Step 1: Mark the location on the wall for the mounting screws.
Step 2: Drill the marked holes.
Step 3: Fix the socket to the wall. Insert the screws in the positions marked.
DRILL & MOUNT
Step 3: Insert the mains supply cable through the bushing (as pictured)
Step 4: Connect the power lines, neutral and protective earth using the terminal blocks provided