
wallbe GmbH – Paderborner Str. 76 – 33189 Schlangen
Tel: +49 5252 989440 Mail: [email protected]
26
6.2 Installation of the wallbe Pro charging pillar
6.2.1 Installation using the pre-built foundation incl. stainless steel mounting
plate
6.
Dig a hole of at least
80 x 100 x 55 cm
(Length x Width x Depth) for the pre-built
foundation
7.
Guide the electrical supply line through the empty conduits in the pre-built
foundation.
8.
Place the pre-built foundation at the desired position within the beforehand digged
hole and use the excavated soil to keep it in place.
9.
Mount your
wallbe Pro charging pillar
onto the stainless steel mounting plate using
the included screws.
10.
Connect the supply line according to your
wallbe Pro model. Please follow the
instructions in chapter “5.1 Supply line connection”.