21
4 OPERATION
Read and understand the Operator’s Manual and all safety signs before operating, maintaining,
adjusting or repairing the Ultra-Veyor System.
Before servicing, adjusting, repairing or
maintaining unit, ensure that unit power
source is completely shut down and can
not start up.
Establish a Lock-Out Tag-Out program for
the worksite.
Do not operate when any guards are
damaged or removed, Install and secure
guards before starting.
Keep hands, feet, clothing and hair away
from all moving and/or rotating parts.
Lock-out tag-out master panel before
opening airlock door.
Clear the area of all bystanders, especially
small children, before starting.
Before supplying electrical power to the
machine, be sure you have adequate
amperage at the proper phase and voltage
to run it. If you do not know or are unsure,
consult a licensed electrician.
Ground all lines and hoses to prevent static
build-up and electrical discharge.
Maintain electrical continuity between
material intake and airlock/blower to
prevent sparks, shocks or electrical
discharges.
Wear appropriate ear protection when
operating machine.
Review safety instructions annually
.
4.1
TO THE NEW OPERATOR OR OWNER
The Walinga Ultra-Veyor System is specifically
designed to convey grain, powder or other granular
material and move it in a stream of pressurized air
to cyclones or deadheads. Be familiar with all
operating and safety procedures before starting.
It is the responsibility of the owner and
operator to read this manual and to train all
other operators before they start working
with the machine. Follow all safety
instructions exactly. Safety is everyone's
business. By following recommended
procedures, a safe working environment is
provided for the operator, bystanders and the
area around the worksite. Untrained
operators are not qualified to operate the
machine.
Many features incorporated into this machine are
the result of suggestions made by customers like
you. Read this manual carefully to learn how to
operate the machine safely and how to set it to
provide maximum efficiency. By following the
operating instructions in conjunction with a good
maintenance program, your Ultra-Veyor System will
provide many years of trouble-free service.
Содержание ULTRA-VEYOR SYSTEM
Страница 1: ...ULTRA VEYOR SYSTEM OPERATOR S MANUAL...
Страница 2: ......
Страница 4: ......
Страница 19: ...17 3 SAFETY SIGN LOCATIONS Think SAFETY Work SAFELY B A B B SAFETY DECALS BLOWER B A A...
Страница 53: ...51...
Страница 55: ......