Waldorf BP8080G Скачать руководство пользователя страница 28

26 

Gas Conversion and Specifications 

Gas Specifications 

 

 - Australia: 

 - New Zealand: 

 

- UK Only: 

 

Category:  

II

2H3P. 

Flue Type:   

A

1. 

 

NOTE: 

* - Measure burner operating pressure at gas control outlet test point with burner  

operating at ‘High’ setting.  Operating pressure is ex-factory set through appliance  

regulator and is not to be adjusted, apart from when carrying out gas conversion, if  

required.  (Refer to ‘Gas Conversion’ section for details). 

 

Natural Gas 

LP Gas (Propane) 

 

BP8080G / GE 

BP8120G / GE 

BP8080G / GE 

BP8120G / GE 

Main Burner Injector 

Ø 4.30mm 

Ø 5.20mm 

Ø 2.50mm 

Ø 2.80mm 

Pilot Burner Injector 

0.35 

Aeration Clearance  (H) 

30mm 30mm 

Operating Pressure 

0.76kPa (*) 

0.60kPa (*) 

2.4kPa (*) 

2.5kPa (*) 

Gas Regulator Cap Screw 

 

 

0.20 

Natural Gas (G20) 

LP Gas (Propane) (G31) 

BP8080G / GE 

BP8120G / GE 

BP8080G / GE 

BP8120G / GE 

Main Burner Injector 

Ø 4.30mm 

Ø 5.20mm 

Ø 2.50mm 

Ø 2.80mm 

Pilot Burner Injector 

0.35 0.20 

Aeration Clearance  (H) 

30mm 30mm 

Supply Pressure 

20mbar 37mbar 

Burner Operating Pressure 

7.5mbar (*) 

6.0mbar (*) 

25.7mbar (*) 

25.5mbar (*) 

Gas Regulator Cap Screw 

 

 

 

 

Natural Gas 

LP Gas 

 

BP8080G / GE 

BP8120G / GE 

BP8080G / GE 

BP8120G / GE 

Main Burner Injector 

Ø 4.30mm 

Ø 5.20mm 

Ø 2.50mm 

Ø 2.80mm 

Pilot Burner Injector 

0.35 

Aeration Clearance  (H) 

30mm 30mm 

Burner Operating Pressure 

0.76kPa (*) 

0.60kPa (*) 

2.4kPa (*) 

2.5kPa (*) 

Gas Regulator Cap Screw 

 

 

0.20 

Содержание BP8080G

Страница 1: ...u a l Gas Bratt Pan BP8080G BPL8080G BPB8080G BPLB8080G BP8080GE BPL8080GE BPB8080GE BPLB8080GE BP8120G BPL8120G BPB8120G BPLB8120G BP8120GE BPL8120GE BPB8120GE BPLB8120GE Date Purchased Serial Numbe...

Страница 2: ...ares tel 1800 337 963 Customer Service tel 1800 335 315 fax 1800 350 281 CANADA Serve Canada Web www servecanada com E Mail info servecanada com Sales tel 800 551 8795 Toll Free Service tel 800 263 14...

Страница 3: ...lation Requirements Unpacking Location Clearances Assembly Gas Connection Electrical Connection Water Connection Commissioning Operation 14 Operation Guide Description of Controls Lighting Pilot Burne...

Страница 4: ...ENDED THAT A REGULAR INSPECTION IS MADE BY A COMPETENT SERVICE PERSON TO ENSURE CORRECT AND SAFE OPERATION OF YOUR APPLIANCE IS MAINTAINED DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPOURS OR LI...

Страница 5: ...s an electric thermostat burner control and over temperature safety cut out Created for compact modular kitchens it is fitted with manually or optional electric power operated tilting mechanism with a...

Страница 6: ...8080G GE BP8120G GE BP8080G GE BP8120G GE Heat Input nett Nominal 18 5kW 23kW 18 5kW 23kW Pilot 190W 140W Gas Rate nett Nominal 1 96m3 hr 2 43m3 hr 1 44kg hr 1 79kg hr Pilot 0 02m3 hr Supply Pressure...

Страница 7: ...mately 74mm from left hand side 574mm from rear of appliance and 290mm from floor BP8080G BP8120G 220 240V a c 50 60Hz 0 1kW 1P N E BP8080GE BP8120GE 220 240V a c 50 60Hz 0 35kW 1P N E Water Supply Re...

Страница 8: ...6 Dimensions Dimensions BP L 8080G...

Страница 9: ...7 Dimensions Dimensions BP L 8080GE Electrical Connection Point Gas Connection Point Water Connection Point...

Страница 10: ...8 Dimensions Dimensions BP L 8120G...

Страница 11: ...9 Dimensions Dimensions BP L 8120GE Electrical Connection Point Gas Connection Point Water Connection Point...

Страница 12: ...d e g paint sealed by the manufacturer are only to be adjusted by an authorised service agent They are not to be adjusted by the installation person Unpacking Remove all packaging Check equipment and...

Страница 13: ...and volume are available The following checks should be made before installation a Gas Type appliance has been supplied for is shown on coloured stickers located above gas connection and on rating pl...

Страница 14: ...burner operating at High Flame setting 7 Verify operating pressure remains correct Electrical Connection 1 Electrical system are all connected through a 2m 10amp flex located at LH side of unit 2 For...

Страница 15: ...hermostat Control Ensure operator has been instructed in areas of correct lighting operation and shutdown procedure for appliance This manual must be kept by owner for future reference and a record of...

Страница 16: ...ons Description of Controls Lighting the Pilot Burner Lighting the Main Burner Setting the Temperature Operating the Water Supply Valve Tilting the Pan BP8180G Model Only Tilting the Pan BP8180GE Mode...

Страница 17: ...Position Graduated Flow Gas Control Knobs G GE Models Pilot Burner Graduations from 1 to 10 for heat control Electrical Tilt Controls GE Models only With the bratt pan lid open the bratt pan can be el...

Страница 18: ...d heat setting NOTE Pilot burner must be lit before the heating system can be operated Operating Water Supply Valve 1 Main power supply to bratt pan should be turned ON to hold solenoid water supply v...

Страница 19: ...continually attempt to light the pilot NOTE If gas supply is turned OFF at mains supply and gas control knob on control panel is left in pilot position with electrical power still ON at bratt pan the...

Страница 20: ...solution using soft cloth or a soft bristled brush Dry appliance thoroughly using a dry clean cloth Clean exterior of bratt pan using a mild detergent and a hot water solution using soft cloth or a s...

Страница 21: ...r surfaces of bratt pan with hot water a mild detergent solution and a soft scrubbing brush Note that gas control knobs are a push fit onto gas and water control valve spindles and can be removed to c...

Страница 22: ...rol knob left in Pilot position with electrical power left ON at mains ignitor will continue to operate and attempt to ignite pilot Check gas control knob is turned to OFF position and electrical powe...

Страница 23: ...rning manual valve check coil for open circuit short circuit and for solenoid coil burn out If solenoid coil is satisfactory disconnect water connection and check inlet filter screen for foreign matte...

Страница 24: ...R AND IGN ELECTRODE IGNITOR 228191 WATER MICROSWITCH 003004 TERMINAL BLOCK 013586 NEON GREEN 227962 NEON AMBER 227963 SWITCH 228999 GAS CONTROL 227830 OVERTEMP 025400 PAN DOWN MICROSWITCH 024802 CONTR...

Страница 25: ...RED BLUE GREEN U2 W2 V2 RED BLUE WHITE GREEN 17 14 29 13 16 2 12 15 3 24 11 9 8 20 4 5 7 6 22 1 30 10 21 27 28 25 18 19 31 COM NO NC COM NC NO 1 2 WATER SOLENOID 020851 THERMOSTAT 024774 228341 PILOT...

Страница 26: ...er panel 1 Refit hand wheel to allow pan to be raised lowered during gas conversion procedure BP8080G BP8120G models only 2 Remove main burner injectors and replace with correct size injectors as show...

Страница 27: ...nection Beside rating plate Commissioning Before leaving installation 1 Check all gas connections for leakage using soapy water or other gas detecting equipment 2 Carry out a Commissioning check of ap...

Страница 28: ...20mm 2 50mm 2 80mm Pilot Burner Injector 0 35 Aeration Clearance H 30mm 30mm Operating Pressure 0 76kPa 0 60kPa 2 4kPa 2 5kPa Gas Regulator Cap Screw 0 20 Natural Gas G20 LP Gas Propane G31 BP8080G G...

Страница 29: ...rt from when carrying out gas conversion if required Refer to Gas Conversion section for details Natural Gas LPG Butane BP8080G GE BP8120G GE BP8080G GE BP8120G GE BP8080G GE BP8120G GE Main Burner 4...

Страница 30: ...950 Terminal Block Motor 024774 Thermostat 50 C 320 C 025400 Over Temp Thermostat 227963 Indicator Neon Orange 227962 Indicator Neon Green 024802 Microswitch Bratt Pan Raise Lower 003004 Microswitch W...

Страница 31: ...rsion Kits Accessories 228798 Plinth Kit 900mm 228802 Plinth Kit 1200mm Models Gas Type to Convert to Nat Gas LPG Butane BP8080G GE 232041 232040 232042 BP8120G GE 232045 232044 232046 Nat Gas UK 2320...

Страница 32: ......

Отзывы: