14
DE
GB NL FR
In order to avoid creating an unsafe situation by inappropriate resetting of
the maximum temperature safety device, this unit may not be powered
via an external switching device (a time switch for example) or connected
to a circuit, which is regularly switched on and off by the power supply
company.
Image 1
Remove the top of the housing with a cross-head screwdriver. Unscrew the fixing screw of the
cladding (1) and then remove the cladding (2).
Image 2
Use two pieces of self-adhesive tape to fix the template on the wall where the device is to be
installed.
Image 3
Drill four 8 mm holes through the template, as indicated. Bear in mind where the water pipes
will be installed later. Install the hot and cold water pipeand supply cable as shown on the
template.
Image 4
Install the device with the supplied screws, plugs and spacer.
The cold water supply should be connected to the inlet on the right of the device (blue = cold
water). The hot water pipe is installed on the left. Make sure the connections are watertight!
Image 5
Cut the cable to the required length and connect it to the terminal strip.
Final installation
•
Install the top of the housing.
•
Insert the fixing screw at the bottom.
Commissioning
•
Fill the device and vent it by opening a hot water tap connected to it.
•
Only switch on the electrical supply once the device is clear of any air.
•
Check the operation of the device.
When the power supply to the device is temporarily interrupted,
the device will enter the standby mode. Switch the device back on by
touching the power-on push-button.
Содержание 42320092
Страница 35: ...35 DE GB NL FR...
Страница 36: ...WB V1 2020 04 www wahlbach com...