20 Assembly
WAGO-ETHERNET-Accessories
852
852-111 5 Port 100BASE-TX Industrial Eco Switch
Manual
Version 1.0.0
Figure 10: Drilling template
The setup of the Industrial Switch can be performed using the following steps:
•
The surface must support at least 1.5 kg for the Industrial Eco Switch.
•
Visually inspect the DC power jack and make sure that it is fully secured to
the power adapter.
•
Make sure that there is proper heat dissipation from and adequate ventilation
around the Industrial Switch. Do not place heavy objects on the Industrial
Switch.
•
The carrier rail must optimally support the EMC measures integrated into
the system and the shielding of the internal data bus connections.
Note
Important note
Grounding Industrial Eco Switch will help eliminate the effects of noise due to
electromagnetic interference (EMI). Always run the ground connection from the
ground screw to the grounding surface prior to connecting DC power.
Pos: 8.4 /Alle Serien (Allgemeine Module)/Überschriften für alle Serien/Geräte anschließen - Überschrift 2 @ 3\mod_1234172889468_21.doc @ 27460