100
VERSION 10/2018
ORDER NUMBER DOC 2339321
.
9.2.3 SAFETY CHECKS AND MAINTENANCE INTERVALS
Every day
Check grounding: see Chapter
Check hoses, tubes and couplings: see Chapter
Check the level of separating agent in the separating agent cup and top up if necessary.
Check and clean the product filter or replace it as required: Chapter
Weekly
Check system for damage.
Check non-return valves: Chapter
Clean product filter: Chapter
Clean pneumatic filter: Chapter
Product valves: Check air or product emission from the leakage holes according to
the respective operating manual.
Check the function of the safety fixtures (see Chapter
):
– External release
– Pumps and accessories: Check protective and monitoring equipment in
accordance with the respective operating manuals.
Yearly or as required
In accordance with DGUV regulation 100-500 Chapter 2.29 and 2.36:
– The liquid ejection devices should be checked by an expert
(e.g., WAGNER service technician) for their safe working conditions as required
and at least every 12 months.
– For shut down devices, the examination can be suspended until the next start-up.
9.2.4 SERVICE PLUG
WARNING
Service plug!
Explosion hazard.
Do not connect the service plug if a potentially explosive gas atmosphere could be
present.
9.2.5 CONNECTIONS FOR STROKE MEASUREMENT
Plug connectors A and B on the rear side of the device are used to connect the potentiometers
and may be inserted and removed, even during operation (lines are intrinsically safe).
9.2.6 TURBINE
When replacing the turbine, attention should be paid to the "TC Turbine Set"
assembly manual with order no. 2320883.
When replacing the generator, attention should be paid to the "TC Generator
Conversion Set" assembly manual with order no. 2336796.