English
2. If
Rec/Recycling phase
has been selected, enter the preferred waiting time for the pressure increase
(standard is 1 min.) in the following menu and press
ENTER
to confirm, otherwise continue with chapter
on page 24.
Pressure increase
Test time
min.
1
ENTER-OK STOP-EXIT
Note
The waiting time ensures that any residual refrigerant vaporises and can then be extracted.
The vaporising residual refrigerant triggers an increase in pressure.
13.8.2 Vacuum process
1. Enter the preferred settings and press
ENTER
to confirm.
Vacuum phase
Yes
No
ENTER-OK STOP-EXIT
2. If
Vacuum phase
has been selected, enter the preferred vacuum time (standard is 20 min), otherwise con-
on page 24.
3. Use the cursor key to enter the vacuum phase time.
4. Press ENTER to confirm both settings.
Vacuum time
min.
20
Vacuum test time
min.
4
ENTER-OK STOP-EXIT
The air conditioning system is drained completely by the vacuum pump. This is used to remove any remain-
ing carrier gases or moisture and to prepare the air conditioning system for the filling process. Any residual
refrigerant extracted which is still bonded in the refrigerant oil is collected by the A/C Service unit and recy-
cled.
13.8.3 Filling process
1. Enter the preferred settings and press
ENTER
to confirm.
Filling phase?
Yes
No
ENTER-OK STOP-EXIT
2. If
Filling phase
has been selected, enter the required value, otherwise continue with chapter
on page 25.
3. Enter the amount of refrigerant oil which was previously drained or which is required.
4. Press the cursor key .
5. Enter the additive quantity.
6. Press the cursor key .
7. Enter the refrigerant quantity.
24
Содержание AirCon Service 6300G
Страница 9: ...English 16 USB port 7...
Страница 42: ...English 17 1 Flowchart ASC6300 G Legend 40...
Страница 45: ...English 17 2 Flowchart ASC6400 G Legend 43...
Страница 48: ...English 17 3 Circuit diagram ASC6300 G 46...
Страница 49: ...English 47...
Страница 50: ...English 17 4 Circuit diagram ASC6400 G 48...
Страница 51: ...English 49...
Страница 93: ...French 17 1 Organigramme ASC6300 G L gende 91...
Страница 96: ...French 17 2 Organigramme ASC6400 G L gende 94...
Страница 99: ...French 17 3 Sch ma lectrique ASC6300 G 97...
Страница 100: ...French 98...
Страница 101: ...French 17 4 Sch ma lectrique ASC6400 G 99...
Страница 102: ...French 100...
Страница 143: ...German 17 1 Flussdiagramm ASC6300 G Legende 141...
Страница 146: ...German 17 2 Flussdiagramm ASC6400 G Legende 144...
Страница 149: ...German 17 3 Schaltplan ASC6300 G 147...
Страница 150: ...German 148...
Страница 151: ...German 17 4 Schaltplan ASC6400 G 149...
Страница 152: ...German 150...
Страница 154: ...4 4 Tel 49 0 2572 879 0 5 6 Domestic 152...
Страница 155: ...Russian 6 1 153...
Страница 156: ...Russian 6 2 R1234yf 405 C R134a 743 C R153A 6 3 154...
Страница 158: ...10 10 10 1 230 V 50 Hz 10 2 10 3 10 4 Short selection Free selection Other selections 156...
Страница 159: ...11 11 1 2 3 4 ECO 5 6 7 8 9 10 11 12 13 14 15 157...
Страница 160: ...Russian 16 USB 158...
Страница 185: ...Russian 2 D E 3 I 4 G 5 J 6 J 7 H G 8 9 10 Vacuum time 178 183...
Страница 193: ...Russian 17 1 ASC6300 G 191...
Страница 195: ...Russian X23 DO X3 UV X4 X5 Z2 X6 Z2 X7 HP X8 HP X9 RE 193...
Страница 196: ...Russian 17 2 ASC6400 G 194...
Страница 198: ...Russian X10 VC X16 CY X2 LP X23 DO X3 UV X4 X5 Z2 X6 Z2 X7 HP X8 HP X9 RE 196...
Страница 199: ...Russian 17 3 ASC6300 G 197...
Страница 200: ...Russian 198...
Страница 201: ...Russian 17 4 ASC6400 G 199...
Страница 202: ...Russian 200...
Страница 244: ...Spanish 17 1 Diagrama de flujo ASC6300 G Leyenda 242...
Страница 247: ...Spanish 17 2 Diagrama de flujo ASC6400 G Leyenda 245...
Страница 250: ...Spanish 17 3 Esquema de conexiones ASC6300 G 248...
Страница 251: ...Spanish 249...
Страница 252: ...Spanish 17 4 Esquema de conexiones ASC6400 G 250...
Страница 253: ...Spanish 251...
Страница 254: ...4445103554 2022 05 02...