wpm_tx004452gb.fm
29
5.8
Servicing the Drive Belt
Check
On new machines or after installing a new belt, check the belt tension after first 20
hours of operation. Check and adjust the belt every 50 hours thereafter.
To adjust the belt:
1. Loosen the four screws
(a)
on the beltguard, then remove the beltguard.
2. Loosen the four screws
(b)
which hold the engine to the console and the nut
(c)
which holds the beltguard back to the console.
3. Slide the engine backward (towards the handle) to tighten the belt, forward to
loosen the belt.
4. Adjust the belt so that it deflects 10-13 mm
(d)
when pressed midway between
the belt pulleys.
5. Make sure that the clutch pulley
(f)
and the exciter pulley
(e)
are in alignment.
Place a straight edge against the exciter pulley
(e)
and move the engine so that
the two pulleys are parallel.
6. Torque all nuts and screws to 20.5 Nm as you reassemble the machine.
wpm_gr005998
VP1030A/AW
Maintenance
Содержание VP1030A-CE
Страница 1: ...Operator s Manual Vibroplate VP1030A CE VP1030AW CE EN 5000401966 10 1119 5 0 0 0 4 0 1 9 6 6...
Страница 14: ...wpm_si001047_01gb fm 14 2 Labels 2 1 Label Locations wpm_gr013776 VP1030A AW Labels...
Страница 35: ...wpm_td000708gb fm 35 8 Dimensions wpm_gr005975 VP1030A AW Dimensions 300 12 914 36 889 35...
Страница 36: ......
Страница 37: ......
Страница 38: ......