Maintenance
Inspecting the Shock Mounts 7.11
71
[en-US] | 09/2022 | 5100061327 | RTLx-SC3 | Operator’s Manual
wc_gr012193
1
2
Fig. 42: Scraper bar
Procedure
1.
Loosen the three screws
(2)
holding each scraper to the drum casting.
2.
Position the scraper 3–6 mm (1/8–1/4 in.) from the drum.
3.
Tighten the three screws on each scraper.
4.
Run the machine to check that the scraper does not rub against the
drum surface.
7.11
Inspecting the Shock Mounts
NOTICE
The shock mounts isolate the upper part of the machine from the heavy vi-
brations produced in the drums. Operating the machine with damaged shock
mounts for an extended period of time may eventually damage other ma-
chine parts.
wc_gr012195
1
1
1
Fig. 43: Shock mounts
Inspect the drum shock mounts
(1)
every 300 hours for cracking, splitting or
tearing. Replace shock mounts as needed.
7.12
Draining the Fuel and Water Separator
Environment
Use a suitable container to collect, store, and dispose of drained fluids and
lubricants in accordance with current environmental protection regulations.
7
Содержание RTLx-SC3
Страница 6: ...This page is intentionally left blank...
Страница 89: ...Index 89 en US 09 2022 5100061327 RTLx SC3 Operator s Manual...
Страница 92: ...Cette page est laiss intentionnellement vierge...
Страница 183: ...Index 183 fr 09 2022 5100061327 RTLx SC3 Notice d utilisation...
Страница 184: ......
Страница 185: ......