wc_tx004594en.fm
25
PT2A / PT3A / PT4A
Operation
4.4
Positioning and Preparing the Machine for Operation
Pre-operation
setup
Perform the procedure below to position and prepare the machine for operation.
1. Position the pump as near to the water as possible, on a firm, flat surface. Keep
the pump level.
2. Connect the suction hose
(a)
to the suction port
(b)
.
■
Suction hoses must be rigid enough not to collapse.
■
At least two T-bolt clamps are recommended for connecting the suction hose
to the suction port. Position the hose clamps at 90° intervals for best seal.
This procedure continues on the next page.
WARNING
Personal injury hazard. Failure to follow the listed procedures may cause injury to
personnel or damage to the machine.
►
All persons setting up the machine must be fully trained on the installation of the
machine.
wc_gr014836
d
a
b
c
e
f
g
WARNING
Personal injury hazard. A loose connection between the suction hose and the
suction port can result in personal injury should the suction hose break loose while
the pump is operating.
►
Only operate the machine when the suction hose is securely fastened to the
suction port.
Содержание PT 2A
Страница 4: ...CALIFORNIA Proposition 65 Warning wc_tx004643en fm...
Страница 8: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 66: ...Pr logo PT2A PT3A PT4A 6 wc_tx004592es fm...
Страница 68: ......
Страница 111: ...Manuel d utilisation Pompe PT2A PT3A PT4A Type PT2A PT3A PT4A Document 5100044643 Date 0518 R vision 01 Langue FR...
Страница 116: ...Avant propos PT2A PT3A PT4A 6 wc_tx004592fr fm...
Страница 118: ......
Страница 166: ......
Страница 207: ......