PT2 / PT3
Operation
4.5
Positioning and Preparing the Machine for Operation
Pre-operation
setup
Perform the procedure below to position and prepare the machine for operation.
1. Position the pump as near to the water as possible, on a firm, flat surface. Keep
the pump level.
2. Connect the suction hose
(a)
to the suction port
(b)
.
■
Suction hoses must be rigid enough not to collapse.
■
At least two T-bolt clamps are recommended for connecting the suction hose
to the suction port. Position the hose clamps at 90° intervals for best seal.
This procedure continues on the next page.
WARNING
Personal injury hazard. Failure to follow the listed procedures may cause injury to
personnel or damage to the machine.
►
All persons setting up the machine must be fully trained on the installation of the
machine.
wc_gr012715
d
a
b
c
e
f
g
WARNING
Personal injury hazard. A loose connection between the suction hose and the
suction port can result in personal injury should the suction hose break loose while
the pump is operating.
►
Only operate the machine when the suction hose is securely fastened to the
suction port.
Содержание PT 2
Страница 1: ...Operator s Manual Pump PT2 PT2A PT2H PT3 PT3A PT3H 5100016561 02 0915 5 1 0 0 0 1 6 5 6 1 EN...
Страница 6: ......
Страница 8: ......
Страница 18: ...wc_si000939gb_FM10 fm 18 Labels PT2 PT3 2 Labels 2 1 Label Locations wc_gr012671 A B C D E F G H D C J K M...
Страница 46: ...wc_tx003915gb_FM10 fm 46 Engine Maintenance Hatz 1B 20 1B 30 770064...
Страница 54: ...wc_td000650gb_FM10 fm 54 Technical Data PT2 PT3...
Страница 56: ...Emission Control Systems Information and Warranty 56 wc_tx001753gb_FM10 fm...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......