10 Use and operation
20
100_0101_op_0018.fm
10 Use and operation
10.1
Prior to starting the machine
After unpacking, the machine is ready for operation.
Checking the machine
Check the machine and all components for damages.
Check protective hose and power cable for damage.
Checking the mains
Check if mains or power distribution on the construction site have the correct operating
voltage (see nameplate of the machine or chapter
Technical Data
).
Check if mains or power distribution on the constructions site are protected in accor-
dance with current standards and regulations.
10.2
Starting up
Connecting the machine to the electric power supply
Follow the instructions for "safe operation of electrical appliances".
WARNING
Improper handling can result in injury or serious material damage.
Read and follow all safety information of this operator's manual, see chapter
Safety
.
WARNING
Damaged insulation.
Danger of electrocution!
Do not kink or damage the protective hose and power cable.
NOTES
The machine may only be connected to AC single phase, connection values see chapter
Technical Data
.
NOTICE
Electrical voltage.
Incorrect voltage can cause damage on the machine.
Check if the voltage of the current source corresponds with the information of
the machine, see chapter
Technical Data
.
Содержание IEC
Страница 32: ......