Checking the hydraulic system for leaks
NOTICE
Leaks and damaged pressure lines must be immediately
repaired or replaced by a Wacker Neuson service center. This
not only increases the operating safety of the machine but also
helps to protect the environment.
►
Leaks and damaged pressure lines must be immediately
repaired or replaced by a Wacker Neuson service center.
►
Have hydraulic hoses replaced every 6 years from the date of
manufacture, even if they do not seem to be damaged.
• Do not operate the machine with leaking or damaged hydraulic system
components.
• Retighten leaking screwed fittings and hose connections only when the
system is not under pressure. Release the pressure before working on
pressurized lines.
• Do not
weld or solder damaged or leaking pressure lines and threaded
fittings, but have damaged parts replaced.
• Wear protective equipment.
Содержание EZ38
Страница 1: ...Track Excavator EZ38 OPERATOR S MANUAL 5200016122 1 1 0814 www wackerneuson com 5 2 0 0 0 1 6 1 2 2 ...
Страница 12: ...1 6 OM EZ38 us 1 1 ez38v100 fm 1 Notes ...
Страница 38: ...3 10 OM EZ38 us 1 1 ez38e300 fm 3 Warning labels Fig 13 ...
Страница 43: ...OM EZ38 us 1 1 ez38e300 fm 3 15 3 Labels Fig 29 ...
Страница 156: ...5 60 OM EZ38 us 1 1 ez38b510 fm 5 Notes ...
Страница 242: ...9 22 OM EZ38 us 1 1 ez38t900 fm 9 Cabin or canopy without extra weight Cabin or canopy with extra weight ...
Страница 243: ...OM EZ38 us 1 1 ez38t900 fm 9 23 9 VDS cabin or canopy without extra weight VDS cabin or canopy with extra weight ...
Страница 244: ...9 24 OM EZ38 us 1 1 ez38t900 fm 9 Dimensions Overview EZ38 ...
Страница 246: ...9 26 OM EZ38 us 1 1 ez38t900 fm 9 Overview EZ38 VDS ...
Страница 248: ...9 28 OM EZ38 us 1 1 ez38t900 fm 9 Notes ...